ENGINEERING AND HYDROGRAPHIC WORK.

ENGINEERING HYDROMETEOROLOGICAL SURVEYS ON RIVERS

(prices are adjusted to the base level as of 01/01/91)

Recording date 2001-01-01

DEVELOPED State Federal Unitary Enterprise "PNIIIS" (Larina T.A., Rykhlova S.I., Chushkina N.I., Bolgova G.R.), JSC "Institute Hydroproject" (Nikanorov E.A.), LLC "NPC Ingeodin" (Kalbergenov G. .G, Larin V.V.) with the participation of the Institute of Water Problems of the Russian Academy of Sciences (Bolgov M.V.), Construction Technology Center LLC and specialists from OJSC Giprotransmost (Skrylnikova L.E.), CJSC Lengiprorechtrans (Baryshnikov L. I.), OJSC "Giprorechtrans" (Serebryakov M.I.), MosTsTISIZ (Lyubashina Z.I., Krashnikov A.F.), CJSC "LenTISIZ" (Solodukhin M.A.), Saratov branch of OJSC GiprodorNII (Shcherbakov A.V.). INTRODUCED Production and Research Institute for Engineering Surveys in Construction (PNIIIS) of the State Construction Committee of Russia. APPROVED Department of Research and Design and Survey Works of the Gosstroy of Russia (letter dated September 26, 2000 N 5-11/91). PUT INTO EFFECT since January 01, 2001 INSTEAD: chapters 3 (tables 62, 63); 5 (Tables 86, 87, 90-92); 6; 7; 8 (tables 128-133 and 148-151); 19 (except for tables 317, 318 and 320, 321); 21 (Table 358-360); Appendix 3 (Table 14-16) Collection of prices for survey work for capital construction, M., 1982.

GENERAL INSTRUCTIONS

1. Directory of basic prices for engineering surveys for construction. Engineering and hydrographic works. Engineering and hydrometeorological surveys on rivers (hereinafter referred to as the “Reference Book”) are recommended for determining the basic cost of survey work when setting prices in agreements (contracts). 2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work for construction and have a license to carry it out. 3. The Directory contains basic prices (hereinafter referred to as “Prices”) for:
  • - engineering and hydrographic work;
  • - engineering and hydrometeorological surveys on rivers;
  • - auxiliary work.
4. Prices are calculated on the basis of official salaries of engineering and technical workers, tariff rates of workers, cost of materials and services, depreciation rates for fixed assets as of 01.01.91, taking into account the basic provisions on the composition of costs included in the cost of products (works, services) with amendments and additions provided for by Decree of the Government of the Russian Federation dated 01.07.95 N 661. 5. Prices are calculated in accordance with the composition, volume and modern technology of field and desk work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed upon by the State Committee for Construction of Russia), and are optimal for determining the cost of field and desk work. Prices for field work are provided for their implementation in expeditionary conditions, i.e. with payment of travel allowances or field allowances to employees. Prices for office processing of survey materials are provided for their implementation in a hospital setting, i.e. without paying employees travel allowances or field allowances. 6. Prices are given in rubles and for certain types of work are given in the form of a fraction: above the line is the price of field work, below the line is the price of office work. In other cases, prices are provided separately for field and desk work. Primary processing of survey materials, carried out under expeditionary conditions, is taken into account in the prices for field work. The prices also take into account the costs of:
  • a) receipt of technical specifications for conducting surveys;
  • b) coordination with the customer of the research program (instructions) and preparation of contractual documentation;
  • c) preparation, verification of instruments, tools, equipment and metrological assurance of the uniformity and accuracy of measuring instruments;
  • d) internal control and acceptance of survey materials;
  • e) delivery of survey reporting materials to the customer.
7. The prices do not take into account and are determined additionally according to the relevant tables (standards) of this Directory and the following costs are provided for in the estimates:
  • a) internal transport;
  • b) external transport;
  • c) organization and liquidation of work at the site;
  • d) drawing up a program (instructions) and a technical report (conclusion);
  • e) preparation and delivery of intermediate engineering survey materials to the customer;
  • f) auxiliary work, including removal (clearing) of snow with a snow cover thickness of more than 0.25 m;
  • g) maintenance of survey bases and radio stations;
  • h) installation, dismantling and maintenance of special survey equipment, as well as watercraft (pontoons, boats, boats) used directly for survey work on water bodies.
8. Prices are calculated for the conditions of survey work in the middle zone of the European part of the Russian Federation (according to the level of wages), a favorable period of the year and the normal mode of survey work. When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as during unfavorable periods of the year, the corresponding coefficients are applied to prices: a) when carrying out surveys in mountainous and high-mountainous areas, the coefficients given in Table 1 are applied to prices.

Table 1

§ District name Coefficient

Mountain and alpine with absolute heights of the surface of the site above sea level, m:

1 from 1500 to 1700 1,1
2 St. 1700 "2000 1,15
3 " 2000 " 3000 1,2
4 St. 3000 1,25
b) when carrying out surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys; c) when carrying out surveys in territories (water areas) with a special regime, a coefficient of 1.25 is applied to prices for field work, and in areas with radioactivity more than 1 m3v/year or 0.1 rem/year - a coefficient of 1.25 to 1, 5 depending on the level of radioactivity assessed in accordance with the Radiation Safety Standards NRB-99 (GP 2.6.1.758-99). Note - Territories (water areas) with a special regime include areas and areas where, due to the situation or established regime, interruptions or difficulties associated with loss of working time during surveys are inevitable: border areas, testing grounds, environmentally hazardous territories, construction sites where explosives are carried out works, existing power stations and substations, open switchgears of power stations, strips up to 200 m wide along existing power lines with a voltage of 500 kV. and above, the surface of railways and highways, main streets (avenues) of cities, the territory of railway stations, ports, backwaters, etc., where delays and interruptions in work caused by heavy traffic, congestion of ships, etc. are inevitable. d) when performing field survey work during an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost.

table 2

§ Duration of unfavorable period, months. Coefficient
1 2-3,5 1,1
2 4-5,5 1,2
3 6-7,5 1,3
4 8-9,5 1,4
e) when carrying out surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3, 4) or in accordance with Resolution of the Council of Ministers of the RSFSR dated 04.02.91 N 76, republican, regional, regional and other government or administrative bodies have established regional coefficients for the wages of workers engaged in survey work; the coefficients given in Table 3 are applied to the total estimated cost of these surveys.

Table 3

§ Regional coefficient to wages Coefficient to the total estimated cost of surveys
1 1,1 1,05
2 1,15 1,08
3 1,2 1,1
4 1,25 1,13
5 1,3 1,15
6 1,4 1,2
7 1,5 1,25
8 1,6 1,3
9 1,7 1,35
10 1,8 1,4
11 1,9 1,45
12 2,0 1,5
Note - When new regional coefficients for wages are introduced after 01.07.98 by law or by directive, the coefficients for the total estimated cost of surveys are determined in accordance with Table 3. f) when carrying out surveys by organizations making payments related to the provision of benefits to persons working in the regions of the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :
  • 1.5 - when carrying out surveys in the Far North;
  • 1.25 - the same in areas equated to the regions of the Far North;
  • 1.15 - in the southern regions of the Irkutsk region, Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk territories), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (with the exception of regions of the Far North and areas equated to regions of the Far North North).
Note - When simultaneously applying the coefficients specified in subparagraphs “d” and “f” of paragraph 8, the overall increasing coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of Table 3 and subparagraph “e”. 9. Internal transport costs associated with the transportation of prospectors, equipment and materials from the location of the survey organization (expedition, party, detachment) to the survey site and back, as well as directly at the work site, are determined according to Table 4 as a percentage of the estimated field cost survey work (taking into account the coefficients given in subparagraphs 8 a, b, c, d of the General Instructions).

Letter from the State Construction Committee of the Russian Federation

DIRECTORY OF BASIC PRICES FOR ENGINEERING SURVEYS

FOR CONSTRUCTION

ENGINEERING AND HYDROGRAPHIC WORK. ENGINEERING

HYDROMETEOROLOGICAL SURVEYS ON RIVERS

(prices are adjusted to the base level as of 01/01/1991)

Put into effect

Developed by State Federal Unitary Enterprise "PNIIIS" (Larina T.A., Rykhlova S.I., Chushkina N.I., Bolgova

G.R.), JSC "Institute Hydroproject" (Nikanorov E.A.), LLC "NPC Ingeodin"

(Kalbergenov G.G., Larin V.V.) with the participation of the Institute of Water Problems of the Russian Academy of Sciences (Bolgov

M.V.), Construction Technology Center LLC and OJSC specialists

"Giprotransmost" (Skrylnikova L.E.), CJSC "Lengiprorechtrans" (Baryshnikov L.I.),

JSC "Giprorechtrans" (Serebryakov M.I.), MosTsTISIZ (Lyubashina Z.I., Krashnikov

A.F.), JSC "LenTISIZ" (Solodukhin M.A.), Saratov branch of JSC "GiprodorNII"

(Shcherbakov A.V.).

Introduced by the Industrial and Scientific Research Institute for

engineering surveys in construction (PNIIIS) of the State Construction Committee of Russia.

Instead: chapters 3 (tables 62, 63); 5 (tables 86, 87, 90 - 92); 6; 7; 8 (Tables 128 - 133 and 148 -

151); 19 (except for tables 317, 318 and 320, 321); 21 (Table 358 - 360); Appendix 3 (Table 14 -

16) Collection of prices for survey work for capital construction, M., 1982

GENERAL INSTRUCTIONS

1. Directory of basic prices for engineering surveys for construction.

Engineering and hydrographic works. Engineering and hydrometeorological surveys

the cost of survey work when setting prices in agreements (contracts).

2. This Handbook is intended for use by enterprises

(organizations) of various organizational and legal forms that perform

survey work for construction and having a license to carry it out.

Engineering and hydrographic works;

Engineering and hydrometeorological surveys on rivers;

Auxiliary work.

4. Prices are calculated based on official salaries of engineering and technical specialists

workers, workers' tariff rates, cost of materials and services, standards

depreciation charges for fixed assets as of 01/01/1991, taking into account

basic provisions on the composition of costs included in the cost of production

(works, services) with amendments and additions provided for by the Resolution

Government of the Russian Federation dated July 1, 1995 N 661.

5. Prices are calculated in accordance with the composition, volume and modern

technology for the production of field and office work that ensures the creation

reporting documentation that meets the requirements of GOSTs and current

regulatory documents (approved or agreed upon by the Gosstroy of Russia), and

are optimal for determining the cost of field and office work.

Prices for field work are provided for their implementation in expeditionary

conditions, i.e. with payment of travel allowances or field allowances to employees.

Prices for office processing of survey materials are provided for

performing them in a hospital setting, i.e. without paying employees travel allowances

or field allowance.

6. Prices are given in rubles and for certain types of work are given as a fraction: above

the line is the price of field work, below the line is the price of desk work. In the rest

In cases, prices are provided separately for field and desk work.

Primary processing of survey materials performed in expeditionary

conditions, is taken into account in the prices for field work.

The prices also take into account the costs of:

a) receipt of technical specifications for conducting surveys;

b) agreement with the customer on the research program (instructions) and preparation

contractual documentation;

c) preparation, verification of instruments, tools, equipment and metrological

ensuring the uniformity and accuracy of measuring instruments;

____________________________________________________________________________________

Not an official publication is intended for informational purposes only.

Wooden houses are provided free of charge to clients of the Drevgrad company.

d) internal control and acceptance of survey materials;

e) delivery of survey reporting materials to the customer.

7. Prices are not taken into account and are determined additionally according to the relevant

tables (standards) of this Handbook and are provided for in estimates

the following expenses:

a) internal transport;

b) external transport;

c) organization and liquidation of work at the site;

d) drawing up a program (instructions) and a technical report (conclusion);

e) preparation and delivery to the customer of intermediate engineering materials

research;

f) auxiliary work, including removal (clearing) of snow when it is thick

snow cover over 0.25 m;

h) installation, dismantling and maintenance of special survey equipment

equipment, as well as watercraft (pontoons, boats, boats) used

directly for carrying out survey work on water bodies.

8. Prices are calculated for survey conditions in the middle zone

European part of the Russian Federation (by wage level),

favorable period of the year and normal mode of survey work.

When determining the estimated cost of surveys carried out in other areas

Russian Federation, as well as during unfavorable periods of the year, prices apply

corresponding coefficients:

a) when carrying out surveys in mountainous and high-mountain areas, to prices

the coefficients given in table 1 are applied;

Table 1

____________________________________________________________________________________

Not an official publication is intended for informational purposes only.

Wooden houses are provided free of charge to clients of the Drevgrad company.

§ Name of district Coefficient

Mountain and alpine with absolute heights

area surface above sea level, m:

1 from 1500 to 1700 1.1

2 St. 1700 "2000 1.15

3 " 2000 " 3000 1,2

b) when carrying out surveys in desert and waterless areas, to the prices for these

research, the coefficients given in Appendix 1 are applied;

c) when carrying out surveys in territories (water areas) with special

regime applies a coefficient of 1.25 to prices for field work, and in areas with

radioactivity more than 1 mSv/year or 0.1 rem/year - coefficient from 1.25 to 1.5 V

depending on the level of radioactivity assessed in accordance with the Standards

radiation safety NRB-99 (GP 2.6.1.758-99).

Note. Territories (water areas) with a special regime include

areas and areas where, due to the situation or established regime, it is inevitable

interruptions or difficulties associated with lost working time during research:

border areas, landfills, environmentally hazardous areas, construction

sites where blasting operations are carried out, operating electrical

stations and substations, open electrical distribution devices

stations, strips up to 200 m wide along existing power lines

voltage 500 kV and above, railway and highway tracks,

main streets (avenues) of cities, the territory of railway stations,

ports, backwaters, etc., where delays and interruptions in work caused by

heavy traffic, congestion of ships, etc.

d) when performing field survey work during an unfavorable period

years in the relevant areas (according to Appendix 2) to their cost

the coefficients given in table 2 are applied.

table 2

§ Length of unfavorable period, Coefficient

____________________________________________________________________________________

Not an official publication is intended for informational purposes only.

Wooden houses are provided free of charge to clients of the Drevgrad company.

e) when carrying out surveys in areas of the Russian Federation, for which

in accordance with the current legislation of the Russian Federation (according to

Appendices 3, 4) or in accordance with the Resolution of the Council of Ministers of the RSFSR

dated 02/04/1991 N 76 republican, regional, regional and others

government or administrative bodies to wages

workers involved in surveys, regional coefficients have been established, resulting in

the estimated cost of these surveys, the coefficients given in

table 3.

Table 3

§ Regional coefficient to Coefficient to the total estimate

wages cost of research

Note. When introduced after 07/01/1998 in legislative or

directive order of new regional coefficients for wages

coefficients for the total estimated cost of surveys are determined in accordance with

table 3.

f) when carrying out surveys by organizations making payments,

related to the provision of benefits to persons working in the Far North and

equivalent areas (according to Appendix 5), as well as in other areas,

established by current legislation, to the total estimated cost

research, the following coefficients are applied:

1.5 - when carrying out surveys in the Far North;

____________________________________________________________________________________

Not an official publication is intended for informational purposes only.

Wooden houses are provided free of charge to clients of the Drevgrad company.

1.25 - the same in areas equated to the regions of the Far North;

1.15 - in the southern regions of the Irkutsk region, Krasnoyarsk Territory and Dalny

East (Amur region, Primorsky and Khabarovsk territories), in Arkhangelsk and

Chita regions, Republics of Buryatia, Karelia, Komi (except for areas

Far North and areas equated to regions of the Far North).

ENGINEERING AND HYDROGRAPHIC WORK.

DIRECTORY OF BASIC PRICES FOR ENGINEERING SURVEYS FOR CONSTRUCTION

PART III BASIC PRICES FOR AUXILIARY WORKS

PART II. BASIC PRICES FOR ENGINEERING HYDROMETEOROLOGICAL SURVEYS ON RIVERS

PART I. BASIC PRICES FOR ENGINEERING AND HYDROGRAPHIC WORK

General provisions

Chapter 1. Depth measurements

Chapter 2. Complex engineering and hydrographic work on rivers, surveys and surveys of shipping routes

Chapter 3. River leveling

Chapter 4. Hydromorphological works

Chapter 5. Ground phototopographic (phototheodolite) survey

Chapter 6. Various hydrographic and geodetic works

Chapter 7. Cartographic and office hydrographic and geodetic works

General provisions

Chapter 8. Reconnaissance survey of the river and its basin

Chapter 9. Construction of hydrometric devices

Chapter 10. Hydrological work on rivers

Chapter 11. Desk hydrological work

Chapter 12. Desk meteorological work

Appendix 1. Coefficients for prices for engineering surveys carried out in desert and waterless areas

Appendix 2. Duration of the unfavorable period of the year for field engineering surveys

Appendix 3. Regional coefficients for wages of employees of design and survey organizations (with the exception of survey expeditions, parties and detachments)

Appendix 4. Regional coefficients for wages of workers of survey expeditions, parties and detachments

Appendix 5. List of regions of the Far North and areas equated to regions of the Far North

(prices are adjusted to the base level as of 01/01/91)

UDC 624.131.3.003.13:338.5(083.78)

DEVELOPED BY SFUP "PNIIIS" (T.A. Larina, S.I. Rykhlova, N.I. Chushkina, G.R. Bolgova), JSC "Institute Hydroproject" (Nikanorov E.A.), LLC "NPC Ingeodin" (Kalbergenov G.G., Larin V.V.) with the participation of the Institute of Water Problems of the Russian Academy of Sciences (Bolgov M.V.), Construction Technology Center LLC and specialists from OJSC Giprotransmost (Skrylnikova L.E.), CJSC Lengiprorechtrans (Baryshnikov L .I.), OJSC "Giprorechtrans" (Serebryakov M.I.), MosTsTISIZ (Lyubashina Z.I., Krashnikov A.F.), CJSC "LenTISIZ" (Solodukhin M.A.), Saratov branch of OJSC "GiprodorNII" (Shcherbakov A.V.).

INTRODUCED by the Production and Research Institute for Engineering Surveys in Construction (PNIIIS) of the State Construction Committee of Russia.

APPROVED by the Department of Research and Design and Survey Works of the Gosstroy of Russia (letter dated September 26, 2000 No. 5-11/91).

instead: chapters 3 (tables 62, 63); 5 (Tables 86, 87, 90-92); 6; 7; 8 (Tables 128-133 and 148-151); 19 (except for tables 317, 318, and 320, 321); 21 (Table 358-360); Appendix 3 (Table 14-16) Collection of prices for survey work for capital construction, M., 1982.

Directory of basic prices for engineering surveys for construction
"Engineering and hydrographic work. Engineering and hydrometeorological surveys on rivers"
(approved by letter of the Department of Research and Design and Survey Works of the State Construction Committee of the Russian Federation dated September 26, 2000 N 5-11/91)

Prices are adjusted to the base level as of 01/01/91.

General instructions

1. "Directory of basic prices for engineering surveys for construction. Engineering and hydrographic work. Engineering and hydrometeorological surveys on rivers" (hereinafter - the Directory) is recommended for determining the basic cost of survey work when setting prices in agreements (contracts).

2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work for construction and have a license to carry it out.

Engineering and hydrographic works;

Engineering and hydrometeorological surveys on rivers;

Auxiliary work.

4. Prices are calculated on the basis of official salaries of engineering and technical workers, tariff rates of workers, cost of materials and services, depreciation rates for fixed assets as of 01/01/91, taking into account the basic provisions on the composition of costs included in the cost of products (works, services ) with amendments and additions provided for by Decree of the Government of the Russian Federation dated 01.07.95 N 661.

5. Prices are calculated in accordance with the composition, volume and modern technology of field and desk work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed upon by the State Committee for Construction of Russia), and are optimal for determining the cost of field and desk work.

Prices for field work are provided for their implementation in expeditionary conditions, i.e. with payment of travel allowances or field allowances to employees.

Prices for office processing of survey materials are provided for their implementation in a hospital setting, i.e. without paying employees travel allowances or field allowances.

6. Prices are given in rubles and for certain types of work are given in the form of a fraction: above the line is the price of field work, below the line is the price of office work. In other cases, prices are provided separately for field and desk work.

Primary processing of survey materials, carried out under expeditionary conditions, is taken into account in the prices for field work.

The prices also take into account the costs of:

a) receipt of technical specifications for conducting surveys;

b) coordination with the customer of the research program (instructions) and preparation of contractual documentation;

c) preparation, verification of instruments, tools, equipment and metrological assurance of the uniformity and accuracy of measuring instruments;

d) internal control and acceptance of survey materials;

e) delivery of survey reporting materials to the customer.

7. The prices do not take into account and are determined additionally according to the relevant tables (standards) of this Directory and the following costs are provided for in the estimates:

a) internal transport;

b) external transport;

c) organization and liquidation of work at the site;

d) drawing up a program (instructions) and a technical report (conclusion);

e) preparation and delivery of intermediate engineering survey materials to the customer;

f) auxiliary work, including removal (clearing) of snow with a snow cover thickness of more than 0.25 m;

h) installation, dismantling and maintenance of special survey equipment, as well as watercraft (pontoons, boats, boats) used directly for survey work on water bodies.

8. Prices are calculated for the conditions of survey work in the middle zone of the European part of the Russian Federation (according to the level of wages), a favorable period of the year and the normal mode of survey work.

When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as during unfavorable periods of the year, the corresponding coefficients are applied to prices:

a) when carrying out surveys in mountainous and high-mountain areas, the coefficients given in Table 1 are applied to prices;

Table 1

b) when carrying out surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;

c) when carrying out surveys in territories (water areas) with a special regime, a coefficient of 1.25 is applied to prices for field work, and in areas with radioactivity more than 1 mSv/year or 0.1 rem/year - a coefficient of 1.25 to 1, 5 depending on the level of radioactivity assessed in accordance with the Radiation Safety Standards NRB-99 (GP 2.6.1.758-99).

Note - Territories (water areas) with a special regime include areas and areas where, due to the situation or established regime, interruptions or difficulties associated with loss of working time during surveys are inevitable: border areas, testing grounds, environmentally hazardous territories, construction sites where explosives are carried out works, existing power stations and substations, open switchgears of power stations, strips up to 200 m wide along existing power lines with a voltage of 500 kV and above, railway and highway beds, main streets (avenues) of cities, the territory of railway stations, ports, backwaters and etc., where delays and interruptions in work caused by heavy traffic, congestion of ships, etc. are inevitable;

d) when performing field survey work during an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost;

e) when carrying out surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3,) or in accordance with Resolution of the Council of Ministers of the RSFSR dated 02/04/91 N 76, republican, regional, regional and other government or administrative bodies have established regional coefficients for the wages of workers engaged in surveys; the coefficients given in Table 3 are applied to the total estimated cost of these surveys;

table 2

Table 3

§ Regional coefficient k
wages
Coefficient to the total estimate
cost of research
1
2
3
4
5
6
7
8
9
10
12
1,1
1,5
1,2
1,25
1,3
1,4
1,5
1,6
1,7
1,8
2,0
1,05
1,08
1,1
1,13
1,15
1,2
1,25
1,3
1,4
1,45
1,5
Note - When introduced after 07/01/98 in legislative or
directive order of new regional coefficients for wages
coefficients for the total estimated cost of surveys are determined in
according to table 3.

f) when carrying out surveys by organizations making payments related to the provision of benefits to persons working in the regions of the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :

1.5 - when carrying out surveys in the Far North;

1.25 - the same, in areas equated to the regions of the Far North;

1.15 - in the southern regions of the Irkutsk region, Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk territories), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (with the exception of regions of the Far North and areas equated to regions of the Far North North).

Note - With the simultaneous application of the coefficients specified in subparagraphs “d” and “f” of paragraph 8, the overall increasing coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of table 3 and subparagraph “f”.

9. Internal transport costs associated with the transportation of prospectors, equipment and materials from the location of the survey organization (expedition, party, detachment) to the survey site and back, as well as directly at the work site, are determined according to Table 4 as a percentage of the estimated field cost survey work (taking into account the coefficients given in subparagraphs 8a, , , General Instructions).

Table 4

§ Distance from the survey base
organizations, expeditions, parties
or a detachment to research areas,
km
Expenses for inland transport, %, based on estimates
cost of field survey work, thousand rubles.
up to 5 St. 5 to 10 St. 10 to
20
St. 20 to
50
St. 50
1 Up to 5 8,75 7,5 6,25 5,0 3,75
2 St. 5 to 10 11,25 10,0 8,75 7,5 6,25
3 " 10 " 15 13,75 12,5 11,25 10,0 8,75
4 St. 15 to 20 16,25 15,0 13,75 12,5 11,25
5 " 20 " 25 18,75 17,5 16,25 15,0 13,75
Notes
1. Inland transport costs may be determined based on actual costs in prices
current period:
a) with an estimated cost of field survey work of up to 5 thousand rubles;
b) when the survey site is removed from the base of the survey organization, expedition, party or
detachment at a distance of over 25 km;
c) when performing field survey work in areas of the Far North and equivalent to them
areas, in sparsely populated (uninhabited) areas (high mountains, desert, taiga, tundra),
when the survey site is removed from the base of the survey organization, expedition, party or detachment
at a distance of up to 25 km;
d) related to the rental and maintenance of special vehicles not intended for
performing survey work - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats,
reindeer and dog sleds, camels, horse packs, etc.
2. If expenses are determined in prices of the current period, the standards of Table 4 do not apply.

10. External transport costs associated with the travel of workers and the transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and back, are determined according to Table 5 as a percentage of the estimate the cost of field work, as well as office and laboratory work carried out under expeditionary conditions (taking into account the coefficients given in subparagraphs 8a, , , General Instructions), including the costs of internal transport, determined according to Table 4, Note 1

Table 5

§ Travel distance
and transportation in one
direction, km
Expenses for external transport in both directions, % of the estimated cost
field work, as well as office work carried out in expeditionary conditions
and laboratory work, duration, months
up to 1 2 3 6 9 12 or more
1
2
3
4
5
6
St. 25 to 100
" 100 " 300
" 300 " 500
" 500 " 1000
" 1000 " 2000
" 2000
14,0
19,6
25,2
30,8
36,4
-
11,5
15,4
21,0
25,2
32,2
39,2
9,1
12,7
16,8
19,6
28,0
36,4
4,5
6,2
8,1
9,7
13,2
20,0
3,5
4,8
6,3
7,3
9,8
16,0
2,8
3,6
4,8
5,5
7,3
12,0
Notes
1. Expenses for external transport for distances up to 25 km are not included in the estimates.
2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable
conditions for travel of workers and transportation of goods to hard-to-reach survey sites and back
costs for external transport can be determined based on actual costs in current prices
period.
3. Expenses for external transport in the executive estimates may be determined in the prices of the current
period.
4. If expenses are determined in prices of the current period, the standards of Table 5 do not apply.

11. When carrying out surveys in particularly difficult natural conditions or in hard-to-reach areas (on polar islands, in the glacier zone, in high mountains, deserts, taiga areas, etc.) to carry out special events (involving climber instructors, guides, organizing rescue services, etc.) additional costs may be provided, which are determined based on actual costs in prices of the current period.

12. Determined by actual costs (price lists, tariffs, invoices, etc.) in prices of the current period and additionally taken into account in the cost of surveys are costs associated with:

Collection (receipt, acquisition) of initial data and information about natural conditions, materials of hydrometeorological observations, aerospace, cartographic and other research materials of past years;

Registration of permits (registration) for engineering surveys;

Carrying out the necessary approvals related to the performance of certain types of field work;

Purchase (manufacture) of floating milestones, hydrometric flumes and measuring weirs, alignment marks, buoys, trawls;

Production of special types of analyzes and studies of samples of soil, bottom sediments, surface and groundwater, snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, radiochemistry of isotopes, etc.);

Renting bases and radio stations during research in the Far North and equivalent areas, in sparsely populated (uninhabited) areas (high mountains, desert, taiga, tundra);

Rental of special survey equipment and special vehicles;

Purchasing a logging ticket; compensation for material damage associated with deforestation during surveys;

Compensation to land users for material damage caused in connection with grasses and surveys on their land plots;

Payment for the services of third-party organizations necessary for carrying out surveys.

13. The costs of organizing and liquidating work at the facility are determined in the amount of 6% of the estimated cost of field survey work, as well as office and laboratory work carried out under expeditionary conditions, taking into account the coefficients given in subparagraphs 8 a, , , of the General Instructions, including expenses for internal transport, determined according to Table 4 (except for the costs provided for in Note 1 of Table 4), as well as the costs of maintaining bases and radio stations, installation, dismantling and maintenance of survey equipment, determined by prices.

Notes

1. The following coefficients are applied to the amount of expenses for organizing and liquidating work, determined according to paragraph 13:

2.5 - for research with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the regions of the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (high mountains, desert, taiga and tundra);

2.0 - for surveys with an estimated cost of over 2 to 5 thousand rubles;

1.5 - the same, over 5 to 10 thousand rubles.

2. When performing field survey work at a site continuously for more than one year, the coefficients given in Table 6 should be applied to the amount of expenses for organizing and liquidating the work.

Table 6

14. When carrying out field work without paying employees travel allowances or field allowance, a coefficient of 0.85 should be applied to the prices for this work.

When performing desk processing of survey materials and laboratory work in expeditionary conditions with the payment of travel allowances or field allowances, a coefficient of 1.15 is applied to the prices for these works.

15. If it is necessary to issue intermediate survey materials to the customer (if this is provided for in the terms of reference, program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs determined under clauses 9-13).

16. When applying several coefficients established by the Directory to prices (costs), the latter are multiplied (with the exception of the coefficients of subparagraphs “e” and “f” of paragraph 8).

17. The estimate attached to the contract provides for additional costs for work and services listed in paragraph 12 of the General Instructions, as well as unforeseen costs associated with the construction of temporary buildings and structures (bases for tents, crossing ditches and ditches, installation of stairs to steep slopes, sheds, moorings for boats and boats, yard restrooms, etc.) in the amount of at least 10% of the estimated cost of survey work.

If you are a user of the Internet version of the GARANT system, you can open this document right now or request it via the Hotline in the system.