§ | District name | Coefficient |
Mountain and alpine with absolute heights of the surface of the site above sea level, m: |
||
1 | from 1500 to 1700 | 1,1 |
2 | St. 1700 "2000 | 1,15 |
3 | " 2000 " 3000 | 1,2 |
4 | St. 3000 | 1,25 |
§ | Duration of unfavorable period, months. | Coefficient |
1 | 2-3,5 | 1,1 |
2 | 4-5,5 | 1,2 |
3 | 6-7,5 | 1,3 |
4 | 8-9,5 | 1,4 |
§ | Regional coefficient to wages | Coefficient to the total estimated cost of surveys |
1 | 1,1 | 1,05 |
2 | 1,15 | 1,08 |
3 | 1,2 | 1,1 |
4 | 1,25 | 1,13 |
5 | 1,3 | 1,15 |
6 | 1,4 | 1,2 |
7 | 1,5 | 1,25 |
8 | 1,6 | 1,3 |
9 | 1,7 | 1,35 |
10 | 1,8 | 1,4 |
11 | 1,9 | 1,45 |
12 | 2,0 | 1,5 |
Letter from the State Construction Committee of the Russian Federation
DIRECTORY OF BASIC PRICES FOR ENGINEERING SURVEYS
FOR CONSTRUCTION
ENGINEERING AND HYDROGRAPHIC WORK. ENGINEERING
HYDROMETEOROLOGICAL SURVEYS ON RIVERS
(prices are adjusted to the base level as of 01/01/1991)
Put into effect
Developed by State Federal Unitary Enterprise "PNIIIS" (Larina T.A., Rykhlova S.I., Chushkina N.I., Bolgova
G.R.), JSC "Institute Hydroproject" (Nikanorov E.A.), LLC "NPC Ingeodin"
(Kalbergenov G.G., Larin V.V.) with the participation of the Institute of Water Problems of the Russian Academy of Sciences (Bolgov
M.V.), Construction Technology Center LLC and OJSC specialists
"Giprotransmost" (Skrylnikova L.E.), CJSC "Lengiprorechtrans" (Baryshnikov L.I.),
JSC "Giprorechtrans" (Serebryakov M.I.), MosTsTISIZ (Lyubashina Z.I., Krashnikov
A.F.), JSC "LenTISIZ" (Solodukhin M.A.), Saratov branch of JSC "GiprodorNII"
(Shcherbakov A.V.).
Introduced by the Industrial and Scientific Research Institute for
engineering surveys in construction (PNIIIS) of the State Construction Committee of Russia.
Instead: chapters 3 (tables 62, 63); 5 (tables 86, 87, 90 - 92); 6; 7; 8 (Tables 128 - 133 and 148 -
151); 19 (except for tables 317, 318 and 320, 321); 21 (Table 358 - 360); Appendix 3 (Table 14 -
16) Collection of prices for survey work for capital construction, M., 1982
GENERAL INSTRUCTIONS
1. Directory of basic prices for engineering surveys for construction.
Engineering and hydrographic works. Engineering and hydrometeorological surveys
the cost of survey work when setting prices in agreements (contracts).
2. This Handbook is intended for use by enterprises
(organizations) of various organizational and legal forms that perform
survey work for construction and having a license to carry it out.
Engineering and hydrographic works;
Engineering and hydrometeorological surveys on rivers;
Auxiliary work.
4. Prices are calculated based on official salaries of engineering and technical specialists
workers, workers' tariff rates, cost of materials and services, standards
depreciation charges for fixed assets as of 01/01/1991, taking into account
basic provisions on the composition of costs included in the cost of production
(works, services) with amendments and additions provided for by the Resolution
Government of the Russian Federation dated July 1, 1995 N 661.
5. Prices are calculated in accordance with the composition, volume and modern
technology for the production of field and office work that ensures the creation
reporting documentation that meets the requirements of GOSTs and current
regulatory documents (approved or agreed upon by the Gosstroy of Russia), and
are optimal for determining the cost of field and office work.
Prices for field work are provided for their implementation in expeditionary
conditions, i.e. with payment of travel allowances or field allowances to employees.
Prices for office processing of survey materials are provided for
performing them in a hospital setting, i.e. without paying employees travel allowances
or field allowance.
6. Prices are given in rubles and for certain types of work are given as a fraction: above
the line is the price of field work, below the line is the price of desk work. In the rest
In cases, prices are provided separately for field and desk work.
Primary processing of survey materials performed in expeditionary
conditions, is taken into account in the prices for field work.
The prices also take into account the costs of:
a) receipt of technical specifications for conducting surveys;
b) agreement with the customer on the research program (instructions) and preparation
contractual documentation;
c) preparation, verification of instruments, tools, equipment and metrological
ensuring the uniformity and accuracy of measuring instruments;
____________________________________________________________________________________
Not an official publication is intended for informational purposes only.
Wooden houses are provided free of charge to clients of the Drevgrad company.
d) internal control and acceptance of survey materials;
e) delivery of survey reporting materials to the customer.
7. Prices are not taken into account and are determined additionally according to the relevant
tables (standards) of this Handbook and are provided for in estimates
the following expenses:
a) internal transport;
b) external transport;
c) organization and liquidation of work at the site;
d) drawing up a program (instructions) and a technical report (conclusion);
e) preparation and delivery to the customer of intermediate engineering materials
research;
f) auxiliary work, including removal (clearing) of snow when it is thick
snow cover over 0.25 m;
h) installation, dismantling and maintenance of special survey equipment
equipment, as well as watercraft (pontoons, boats, boats) used
directly for carrying out survey work on water bodies.
8. Prices are calculated for survey conditions in the middle zone
European part of the Russian Federation (by wage level),
favorable period of the year and normal mode of survey work.
When determining the estimated cost of surveys carried out in other areas
Russian Federation, as well as during unfavorable periods of the year, prices apply
corresponding coefficients:
a) when carrying out surveys in mountainous and high-mountain areas, to prices
the coefficients given in table 1 are applied;
Table 1
____________________________________________________________________________________
Not an official publication is intended for informational purposes only.
Wooden houses are provided free of charge to clients of the Drevgrad company.
§ Name of district Coefficient
Mountain and alpine with absolute heights
area surface above sea level, m:
1 from 1500 to 1700 1.1
2 St. 1700 "2000 1.15
3 " 2000 " 3000 1,2
b) when carrying out surveys in desert and waterless areas, to the prices for these
research, the coefficients given in Appendix 1 are applied;
c) when carrying out surveys in territories (water areas) with special
regime applies a coefficient of 1.25 to prices for field work, and in areas with
radioactivity more than 1 mSv/year or 0.1 rem/year - coefficient from 1.25 to 1.5 V
depending on the level of radioactivity assessed in accordance with the Standards
radiation safety NRB-99 (GP 2.6.1.758-99).
Note. Territories (water areas) with a special regime include
areas and areas where, due to the situation or established regime, it is inevitable
interruptions or difficulties associated with lost working time during research:
border areas, landfills, environmentally hazardous areas, construction
sites where blasting operations are carried out, operating electrical
stations and substations, open electrical distribution devices
stations, strips up to 200 m wide along existing power lines
voltage 500 kV and above, railway and highway tracks,
main streets (avenues) of cities, the territory of railway stations,
ports, backwaters, etc., where delays and interruptions in work caused by
heavy traffic, congestion of ships, etc.
d) when performing field survey work during an unfavorable period
years in the relevant areas (according to Appendix 2) to their cost
the coefficients given in table 2 are applied.
table 2
§ Length of unfavorable period, Coefficient
____________________________________________________________________________________
Not an official publication is intended for informational purposes only.
Wooden houses are provided free of charge to clients of the Drevgrad company.
e) when carrying out surveys in areas of the Russian Federation, for which
in accordance with the current legislation of the Russian Federation (according to
Appendices 3, 4) or in accordance with the Resolution of the Council of Ministers of the RSFSR
dated 02/04/1991 N 76 republican, regional, regional and others
government or administrative bodies to wages
workers involved in surveys, regional coefficients have been established, resulting in
the estimated cost of these surveys, the coefficients given in
table 3.
Table 3
§ Regional coefficient to Coefficient to the total estimate
wages cost of research
Note. When introduced after 07/01/1998 in legislative or
directive order of new regional coefficients for wages
coefficients for the total estimated cost of surveys are determined in accordance with
table 3.
f) when carrying out surveys by organizations making payments,
related to the provision of benefits to persons working in the Far North and
equivalent areas (according to Appendix 5), as well as in other areas,
established by current legislation, to the total estimated cost
research, the following coefficients are applied:
1.5 - when carrying out surveys in the Far North;
____________________________________________________________________________________
Not an official publication is intended for informational purposes only.
Wooden houses are provided free of charge to clients of the Drevgrad company.
1.25 - the same in areas equated to the regions of the Far North;
1.15 - in the southern regions of the Irkutsk region, Krasnoyarsk Territory and Dalny
East (Amur region, Primorsky and Khabarovsk territories), in Arkhangelsk and
Chita regions, Republics of Buryatia, Karelia, Komi (except for areas
Far North and areas equated to regions of the Far North).
ENGINEERING AND HYDROGRAPHIC WORK.
DIRECTORY OF BASIC PRICES FOR ENGINEERING SURVEYS FOR CONSTRUCTION
PART III BASIC PRICES FOR AUXILIARY WORKS
PART II. BASIC PRICES FOR ENGINEERING HYDROMETEOROLOGICAL SURVEYS ON RIVERS
PART I. BASIC PRICES FOR ENGINEERING AND HYDROGRAPHIC WORK
General provisions
Chapter 1. Depth measurements
Chapter 2. Complex engineering and hydrographic work on rivers, surveys and surveys of shipping routes
Chapter 3. River leveling
Chapter 4. Hydromorphological works
Chapter 5. Ground phototopographic (phototheodolite) survey
Chapter 6. Various hydrographic and geodetic works
Chapter 7. Cartographic and office hydrographic and geodetic works
General provisions
Chapter 8. Reconnaissance survey of the river and its basin
Chapter 9. Construction of hydrometric devices
Chapter 10. Hydrological work on rivers
Chapter 11. Desk hydrological work
Chapter 12. Desk meteorological work
Appendix 1. Coefficients for prices for engineering surveys carried out in desert and waterless areas
Appendix 2. Duration of the unfavorable period of the year for field engineering surveys
Appendix 3. Regional coefficients for wages of employees of design and survey organizations (with the exception of survey expeditions, parties and detachments)
Appendix 4. Regional coefficients for wages of workers of survey expeditions, parties and detachments
Appendix 5. List of regions of the Far North and areas equated to regions of the Far North
(prices are adjusted to the base level as of 01/01/91)
UDC 624.131.3.003.13:338.5(083.78)
DEVELOPED BY SFUP "PNIIIS" (T.A. Larina, S.I. Rykhlova, N.I. Chushkina, G.R. Bolgova), JSC "Institute Hydroproject" (Nikanorov E.A.), LLC "NPC Ingeodin" (Kalbergenov G.G., Larin V.V.) with the participation of the Institute of Water Problems of the Russian Academy of Sciences (Bolgov M.V.), Construction Technology Center LLC and specialists from OJSC Giprotransmost (Skrylnikova L.E.), CJSC Lengiprorechtrans (Baryshnikov L .I.), OJSC "Giprorechtrans" (Serebryakov M.I.), MosTsTISIZ (Lyubashina Z.I., Krashnikov A.F.), CJSC "LenTISIZ" (Solodukhin M.A.), Saratov branch of OJSC "GiprodorNII" (Shcherbakov A.V.).
INTRODUCED by the Production and Research Institute for Engineering Surveys in Construction (PNIIIS) of the State Construction Committee of Russia.
APPROVED by the Department of Research and Design and Survey Works of the Gosstroy of Russia (letter dated September 26, 2000 No. 5-11/91).
instead: chapters 3 (tables 62, 63); 5 (Tables 86, 87, 90-92); 6; 7; 8 (Tables 128-133 and 148-151); 19 (except for tables 317, 318, and 320, 321); 21 (Table 358-360); Appendix 3 (Table 14-16) Collection of prices for survey work for capital construction, M., 1982.
Directory of basic prices for engineering surveys for construction
"Engineering and hydrographic work. Engineering and hydrometeorological surveys on rivers"
(approved by letter of the Department of Research and Design and Survey Works of the State Construction Committee of the Russian Federation dated September 26, 2000 N 5-11/91)
Prices are adjusted to the base level as of 01/01/91.
General instructions
1. "Directory of basic prices for engineering surveys for construction. Engineering and hydrographic work. Engineering and hydrometeorological surveys on rivers" (hereinafter - the Directory) is recommended for determining the basic cost of survey work when setting prices in agreements (contracts).
2. This Handbook is intended for use by enterprises (organizations) of various organizational and legal forms that carry out survey work for construction and have a license to carry it out.
Engineering and hydrographic works;
Engineering and hydrometeorological surveys on rivers;
Auxiliary work.
4. Prices are calculated on the basis of official salaries of engineering and technical workers, tariff rates of workers, cost of materials and services, depreciation rates for fixed assets as of 01/01/91, taking into account the basic provisions on the composition of costs included in the cost of products (works, services ) with amendments and additions provided for by Decree of the Government of the Russian Federation dated 01.07.95 N 661.
5. Prices are calculated in accordance with the composition, volume and modern technology of field and desk work, ensuring the creation of reporting documentation that meets the requirements of GOSTs and current regulatory documents (approved or agreed upon by the State Committee for Construction of Russia), and are optimal for determining the cost of field and desk work.
Prices for field work are provided for their implementation in expeditionary conditions, i.e. with payment of travel allowances or field allowances to employees.
Prices for office processing of survey materials are provided for their implementation in a hospital setting, i.e. without paying employees travel allowances or field allowances.
6. Prices are given in rubles and for certain types of work are given in the form of a fraction: above the line is the price of field work, below the line is the price of office work. In other cases, prices are provided separately for field and desk work.
Primary processing of survey materials, carried out under expeditionary conditions, is taken into account in the prices for field work.
The prices also take into account the costs of:
a) receipt of technical specifications for conducting surveys;
b) coordination with the customer of the research program (instructions) and preparation of contractual documentation;
c) preparation, verification of instruments, tools, equipment and metrological assurance of the uniformity and accuracy of measuring instruments;
d) internal control and acceptance of survey materials;
e) delivery of survey reporting materials to the customer.
7. The prices do not take into account and are determined additionally according to the relevant tables (standards) of this Directory and the following costs are provided for in the estimates:
a) internal transport;
b) external transport;
c) organization and liquidation of work at the site;
d) drawing up a program (instructions) and a technical report (conclusion);
e) preparation and delivery of intermediate engineering survey materials to the customer;
f) auxiliary work, including removal (clearing) of snow with a snow cover thickness of more than 0.25 m;
h) installation, dismantling and maintenance of special survey equipment, as well as watercraft (pontoons, boats, boats) used directly for survey work on water bodies.
8. Prices are calculated for the conditions of survey work in the middle zone of the European part of the Russian Federation (according to the level of wages), a favorable period of the year and the normal mode of survey work.
When determining the estimated cost of surveys carried out in other regions of the Russian Federation, as well as during unfavorable periods of the year, the corresponding coefficients are applied to prices:
a) when carrying out surveys in mountainous and high-mountain areas, the coefficients given in Table 1 are applied to prices;
Table 1
b) when carrying out surveys in desert and waterless areas, the coefficients given in Appendix 1 are applied to the prices for these surveys;
c) when carrying out surveys in territories (water areas) with a special regime, a coefficient of 1.25 is applied to prices for field work, and in areas with radioactivity more than 1 mSv/year or 0.1 rem/year - a coefficient of 1.25 to 1, 5 depending on the level of radioactivity assessed in accordance with the Radiation Safety Standards NRB-99 (GP 2.6.1.758-99).
Note - Territories (water areas) with a special regime include areas and areas where, due to the situation or established regime, interruptions or difficulties associated with loss of working time during surveys are inevitable: border areas, testing grounds, environmentally hazardous territories, construction sites where explosives are carried out works, existing power stations and substations, open switchgears of power stations, strips up to 200 m wide along existing power lines with a voltage of 500 kV and above, railway and highway beds, main streets (avenues) of cities, the territory of railway stations, ports, backwaters and etc., where delays and interruptions in work caused by heavy traffic, congestion of ships, etc. are inevitable;
d) when performing field survey work during an unfavorable period of the year in the relevant areas (according to Appendix 2), the coefficients given in Table 2 are applied to their cost;
e) when carrying out surveys in regions of the Russian Federation, for which, in accordance with the current legislation of the Russian Federation (according to Appendices 3,) or in accordance with Resolution of the Council of Ministers of the RSFSR dated 02/04/91 N 76, republican, regional, regional and other government or administrative bodies have established regional coefficients for the wages of workers engaged in surveys; the coefficients given in Table 3 are applied to the total estimated cost of these surveys;
table 2
Table 3
§ | Regional coefficient k wages |
Coefficient to the total estimate cost of research |
1 2 3 4 5 6 7 8 9 10 12 |
1,1 1,5 1,2 1,25 1,3 1,4 1,5 1,6 1,7 1,8 2,0 |
1,05 1,08 1,1 1,13 1,15 1,2 1,25 1,3 1,4 1,45 1,5 |
Note - When introduced after 07/01/98 in legislative or directive order of new regional coefficients for wages coefficients for the total estimated cost of surveys are determined in according to table 3. |
f) when carrying out surveys by organizations making payments related to the provision of benefits to persons working in the regions of the Far North and equivalent areas (according to Appendix 5), as well as in other areas established by current legislation, the corresponding coefficients are applied to the total estimated cost of surveys :
1.5 - when carrying out surveys in the Far North;
1.25 - the same, in areas equated to the regions of the Far North;
1.15 - in the southern regions of the Irkutsk region, Krasnoyarsk region and the Far East (Amur region, Primorsky and Khabarovsk territories), in the Arkhangelsk and Chita regions, the Republics of Buryatia, Karelia, Komi (with the exception of regions of the Far North and areas equated to regions of the Far North North).
Note - With the simultaneous application of the coefficients specified in subparagraphs “d” and “f” of paragraph 8, the overall increasing coefficient to the total of the estimated cost of surveys is determined by summing the unit with the fractional parts of the corresponding coefficients of table 3 and subparagraph “f”.
9. Internal transport costs associated with the transportation of prospectors, equipment and materials from the location of the survey organization (expedition, party, detachment) to the survey site and back, as well as directly at the work site, are determined according to Table 4 as a percentage of the estimated field cost survey work (taking into account the coefficients given in subparagraphs 8a, , , General Instructions).
Table 4
§ | Distance from the survey base organizations, expeditions, parties or a detachment to research areas, km |
Expenses for inland transport, %, based on estimates cost of field survey work, thousand rubles. |
||||
up to 5 | St. 5 to 10 | St. 10 to 20 |
St. 20 to 50 |
St. 50 | ||
1 | Up to 5 | 8,75 | 7,5 | 6,25 | 5,0 | 3,75 |
2 | St. 5 to 10 | 11,25 | 10,0 | 8,75 | 7,5 | 6,25 |
3 | " 10 " 15 | 13,75 | 12,5 | 11,25 | 10,0 | 8,75 |
4 | St. 15 to 20 | 16,25 | 15,0 | 13,75 | 12,5 | 11,25 |
5 | " 20 " 25 | 18,75 | 17,5 | 16,25 | 15,0 | 13,75 |
Notes 1. Inland transport costs may be determined based on actual costs in prices current period: a) with an estimated cost of field survey work of up to 5 thousand rubles; b) when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of over 25 km; c) when performing field survey work in areas of the Far North and equivalent to them areas, in sparsely populated (uninhabited) areas (high mountains, desert, taiga, tundra), when the survey site is removed from the base of the survey organization, expedition, party or detachment at a distance of up to 25 km; d) related to the rental and maintenance of special vehicles not intended for performing survey work - airplanes, helicopters, all-terrain vehicles, boats, barges, longboats, reindeer and dog sleds, camels, horse packs, etc. 2. If expenses are determined in prices of the current period, the standards of Table 4 do not apply. |
10. External transport costs associated with the travel of workers and the transportation of survey equipment and cargo from the permanent location of the organization performing the survey to the base of the survey expedition, party or detachment (or to the survey site) and back, are determined according to Table 5 as a percentage of the estimate the cost of field work, as well as office and laboratory work carried out under expeditionary conditions (taking into account the coefficients given in subparagraphs 8a, , , General Instructions), including the costs of internal transport, determined according to Table 4, Note 1
Table 5
§ | Travel distance and transportation in one direction, km |
Expenses for external transport in both directions, % of the estimated cost field work, as well as office work carried out in expeditionary conditions and laboratory work, duration, months |
|||||
up to 1 | 2 | 3 | 6 | 9 | 12 or more | ||
1 2 3 4 5 6 |
St. 25 to 100 " 100 " 300 " 300 " 500 " 500 " 1000 " 1000 " 2000 " 2000 |
14,0 19,6 25,2 30,8 36,4 - |
11,5 15,4 21,0 25,2 32,2 39,2 |
9,1 12,7 16,8 19,6 28,0 36,4 |
4,5 6,2 8,1 9,7 13,2 20,0 |
3,5 4,8 6,3 7,3 9,8 16,0 |
2,8 3,6 4,8 5,5 7,3 12,0 |
Notes 1. Expenses for external transport for distances up to 25 km are not included in the estimates. 2. When performing certain types of surveys costing up to 5 thousand rubles. or the presence of unfavorable conditions for travel of workers and transportation of goods to hard-to-reach survey sites and back costs for external transport can be determined based on actual costs in current prices period. 3. Expenses for external transport in the executive estimates may be determined in the prices of the current period. 4. If expenses are determined in prices of the current period, the standards of Table 5 do not apply. |
11. When carrying out surveys in particularly difficult natural conditions or in hard-to-reach areas (on polar islands, in the glacier zone, in high mountains, deserts, taiga areas, etc.) to carry out special events (involving climber instructors, guides, organizing rescue services, etc.) additional costs may be provided, which are determined based on actual costs in prices of the current period.
12. Determined by actual costs (price lists, tariffs, invoices, etc.) in prices of the current period and additionally taken into account in the cost of surveys are costs associated with:
Collection (receipt, acquisition) of initial data and information about natural conditions, materials of hydrometeorological observations, aerospace, cartographic and other research materials of past years;
Registration of permits (registration) for engineering surveys;
Carrying out the necessary approvals related to the performance of certain types of field work;
Purchase (manufacture) of floating milestones, hydrometric flumes and measuring weirs, alignment marks, buoys, trawls;
Production of special types of analyzes and studies of samples of soil, bottom sediments, surface and groundwater, snow and ice, performed by specialized laboratories licensed to carry out such work (bacteriological analysis, radiochemistry of isotopes, etc.);
Renting bases and radio stations during research in the Far North and equivalent areas, in sparsely populated (uninhabited) areas (high mountains, desert, taiga, tundra);
Rental of special survey equipment and special vehicles;
Purchasing a logging ticket; compensation for material damage associated with deforestation during surveys;
Compensation to land users for material damage caused in connection with grasses and surveys on their land plots;
Payment for the services of third-party organizations necessary for carrying out surveys.
13. The costs of organizing and liquidating work at the facility are determined in the amount of 6% of the estimated cost of field survey work, as well as office and laboratory work carried out under expeditionary conditions, taking into account the coefficients given in subparagraphs 8 a, , , of the General Instructions, including expenses for internal transport, determined according to Table 4 (except for the costs provided for in Note 1 of Table 4), as well as the costs of maintaining bases and radio stations, installation, dismantling and maintenance of survey equipment, determined by prices.
Notes
1. The following coefficients are applied to the amount of expenses for organizing and liquidating work, determined according to paragraph 13:
2.5 - for research with an estimated cost of up to 2 thousand rubles. or during surveys (regardless of their cost) carried out in the regions of the Far North and equivalent areas, as well as in sparsely populated (uninhabited) areas (high mountains, desert, taiga and tundra);
2.0 - for surveys with an estimated cost of over 2 to 5 thousand rubles;
1.5 - the same, over 5 to 10 thousand rubles.
2. When performing field survey work at a site continuously for more than one year, the coefficients given in Table 6 should be applied to the amount of expenses for organizing and liquidating the work.
Table 6
14. When carrying out field work without paying employees travel allowances or field allowance, a coefficient of 0.85 should be applied to the prices for this work.
When performing desk processing of survey materials and laboratory work in expeditionary conditions with the payment of travel allowances or field allowances, a coefficient of 1.15 is applied to the prices for these works.
15. If it is necessary to issue intermediate survey materials to the customer (if this is provided for in the terms of reference, program), a coefficient of 1.1 is applied to the cost of these surveys (except for the costs determined under clauses 9-13).
16. When applying several coefficients established by the Directory to prices (costs), the latter are multiplied (with the exception of the coefficients of subparagraphs “e” and “f” of paragraph 8).
17. The estimate attached to the contract provides for additional costs for work and services listed in paragraph 12 of the General Instructions, as well as unforeseen costs associated with the construction of temporary buildings and structures (bases for tents, crossing ditches and ditches, installation of stairs to steep slopes, sheds, moorings for boats and boats, yard restrooms, etc.) in the amount of at least 10% of the estimated cost of survey work.