Wet facade is a facade finishing technology using several layers of materials (thermal insulation, rigid layer, decorative plaster). The basis of wet facade technology is the use of construction and adhesive mixtures. This technology for finishing walls and building facades is widely used in both the commercial and residential sectors. Suitable for various types houses and wall materials, looks presentable, easy to maintain.
Advantages of wet facade technology:
A ventilated façade is modern technology façade repairs and exterior finishing walls using a frame made from a system of profiles and facing materials(porcelain tiles or composite panels). The supporting structure in the form of a frame ensures even and rigid fastening of materials at the required distance for free air circulation.
The main advantages of hinged ventilated facades:
Facade plastering is a repair using facade plaster, carrying out preparation and plastering work external walls building. Characterized by accessibility, simplicity and speed of implementation repair work. Depending on the wall material, the optimal type of plaster is selected.
Before plastering the facade, you must first prepare the walls - clean and prime the surface. The plaster is applied in 3 layers - base, main and finishing. For optimal adhesion of the plaster, a reinforcing metal mesh is attached to the walls or insulation.
The plaster solution is applied using a special pneumatic bucket or manually. Next, the solution is leveled along special guides. The next layer of plaster creates adhesion to the finish. Finishing layer rubbed over or decorated with a relief (pattern).
Types of plaster for facade finishing:
Advantages of decorative plaster:
Siding finishing involves external cladding building walls with panels. This finishing method has become widespread due to its reasonable price combined with the simplicity and quick implementation of installation. Siding is used for finishing residential and commercial buildings of all types.
Types of siding (panel materials):
The main advantages of finishing facades with siding:
Facing the facade with clinker tiles or bricks is a premium option for finishing the facade with imitation brick or stone. The material is based on natural clay, fired special technology. Clinker tiles - affordable option brick-like cladding, both external and interior walls building.
Possibilities of clinker facade technology
Work on insulating the base walls of a building represents a complex of works on the preparation and installation of a heat-insulating layer. At the moment, there are two main options for insulation for external finishing - mineral wool slabs or expanded polystyrene.
The technology for insulating walls from the outside is correct, both in practical terms (savings usable area), and the technical side (protection of walls and removal of the point of condensation formation). The base walls are prepared and primed, then the insulation is installed using an adhesive solution and additionally reinforced with dowels.
Mineral wool slabs
Basalt mineral wool is inexpensive and effective method insulate any type of building. The mineral wool layer must be protected with vapor and waterproofing. Insulation with this material is ideal for wooden houses, and also goes well with “wet” facade technology.
Foam plastic (expanded polystyrene, penoplex)
Polystyrene foam is an economical, very lightweight and easy-to-install material that also has good sound insulation. However, foam plastic does not allow air and steam to pass through, which requires equipping the house with a ventilation system. Also, foam plastic requires reliable waterproofing, because... susceptible to moisture. The use of foam plastic is recommended in combination with ventilated facade technology.
The main advantages of facade insulation:
Facade repair
Facade repair– restoration or reconstruction of old coatings, as well as a complex of facade works to replace technologies for finishing the external walls of private houses, administrative buildings, industrial complexes and residential buildings.
We are not considering the option of new construction (you can read about technologies for creating building facades on other pages of our website). Reconstruction of facades involves working with existing defects in the walls of the building, the consequences of poorly performed facade work, and the results of using the facade for a certain time.
The Bau-Group company identifies three main problems with the condition of the façade in need of reconstruction.
There are many harmful and aggressive factors affecting the condition of building facades. These are temperature fluctuations, frost and wind, ultraviolet radiation and oxides, exhaust gases and dirt, microorganisms, etc. The façade is “afraid” of water. Water destroys the facade quickly, and in combination with weather conditions in Russia (numerous zero crossings) - even faster. Therefore, first of all, in order not to constantly repair the facade, it is necessary to ensure that there is no access of water to the facade of the building and inside the system. We are not talking about “slanting rain”. And we are talking about the roof, parapet covers, eaves and window sills, impeccably executed basement waterproofing and proper operation of the building in winter period, control of drains, etc.
Materials. Naturally, saving on materials reduces the service life of the facade. But, from our point of view, this is not the main problem of repairing the facade of a cottage or administrative building, although it is also significant. Because a professional will refuse to work with low-quality or “weak” material. We have extensive experience in repairing building facades. And this experience says that WE are responsible for everything. Even for the Customer. We don't want this, believe me. Imagine how you can be responsible for a Customer if he is a year old!!! installs parapet covers, but the already installed façade suffers and water enters it. Therefore, we simply do not undertake to work when the selected materials or technologies do not lead to high-quality results. This means this is not our object, not our Customer, not our philosophy.
It is impossible to do well what you cannot do or do rarely.
Interior specialists who believe that the repair of facades of residential buildings and the renovation of premises are one and the same thing, introduce interior mesh, gypsum putties into the facade system, confuse technologies, etc. Firms and teams that fail to organize work save on everything. They hire unskilled workers, do not have engineers on staff, and simply do not like this work, do not know how, and most importantly, do not want to waste time on solving the problems that have arisen. Everyone makes mistakes, it’s almost impossible to take into account and provide for everything (try to take into account the shrinkage coefficient of the building, if during the examination of the facade “curved” beacons are found in the basement of the house - not a single facade insulation system will withstand it, no matter how well you make it) - but the question in how we solve problems that arise, how we worry about the results of our work, and how much effort we put into it.
The teams know how to do something, they know the façade operation “A”, but they forget the operation “B”. And often they simply don’t know the technology and do things on the façade that are prohibited by SNIPs.
The first paragraphs describe the main criteria that lead to negative results. construction work on the facades of buildings. To this we add general trends in the construction industry:
Cosmetic repair of facades- easy updating of the “freshness” of the facade. Fill out the cracks, putty, and paint the facade. Sometimes, to significantly increase the maintenance-free service life of a facade, it is possible to use separate processes from SFTK technologies - applying reinforcing reinforcements adhesive compositions and finishing plasters.
Major renovation of house facades– complete refurbishment of the façade. Dismantling and repetition of old facade finishing technologies, but using modern materials and other quality, construction work or the use of new technologies on facades - insulation of facades with SFTK systems, curtain facades, reconstruction of facades with changes in the architectural appearance of the building. The type of repair is determined by the condition of the facade and the presence of damage.
An important and responsible stage. Damage to the walls is detected. Previous technologies and reasons affecting the quality of operation of the facade are identified, which must be eliminated in the future.
Project documentation helps to establish the façade technologies used for a particular building, understand the structure of the walls, determine the list of hidden works, and suggest the use of specific materials. Unfortunately, customers often do not have documentation on the construction of facades for one reason or another. Therefore, it is necessary to involve additional expert organizations and research laboratories.
At this stage, they also check the quality of the roof, drainage systems, parapet covers and ebbs, the work of related organizations (for example, air conditioning), and the work of operating organizations.
Based on the data from the examination and inspection of the facade, the recommendations of technical specialists, and the requirements of Customers, technologies for repairing the facades of residential and administrative buildings are determined. This could be work to locally eliminate comments, or repeat previous façade repair technologies, but with modern materials by competent construction organization, specializing only in facade repairs. Or the use of new technologies and solutions to create a different architectural facade. Choice low-quality materials, inappropriate technologies, replacement of design solutions, and simply - the lack of competence of construction participants when constructing a new facade or its repair - lead to short term façade services.
All external wall repair and reconstruction work must be carried out in accordance with approved and agreed upon technical instructions, design solutions, Albums technical solutions and instructions from the material supplier. The entire process of facade work should be reflected in the work production log with marks from inspection services and technical supervision of the customer. Require all participants in the process (including customers) to perform the necessary operations (installation of windows, installation of roofing, parapets, provision of electricity, etc.).
Today, two main types of facade systems are widely represented on the market:
The Bau-group company has been producing facade work and plastering facades since 1998 - our specialization. We have extensive experience in implementing facade repair projects and using modern facade technologies at major renovation sites. We are often invited to rescue and complete work for other contractors when technologies are violated, the quality of work does not meet standards, deadlines are missed and high-quality repairs facade, completion of construction and commissioning of facades. We perform our work efficiently within the agreed time frame and at the agreed cost.
Material
Works
Installation of the SFTK facade insulation system with a thin plaster layer ( wet facade)
Material from 600 rub.
Works 1200 - 1450 rub.
Fast rhythm modern life no delay. Using new materials and technologies that have appeared on construction market, it has become quite feasible to carry out facade works and in winter.
You should not consider the cold season as some kind of obstacle. Cladding the facade of a house in winter will allow you to save time and finish construction earlier. The procedure is as follows:
1) Installation scaffolding. It is performed in the same way as in the summer, without any differences.
2) Installation of a moisture-proof film around the perimeter. It is needed to maintain a stable temperature directly on the external walls.
3) Installation heating devices. For this purpose, devices powered by electricity or gasoline can be used. Heaters that produce soot are absolutely unacceptable, so as not to spoil the appearance of the building.
After installing the film, thanks to heating, the desired microclimate will be formed and it will be possible to carry out repairs at a temperature under the awning of about 5-8 degrees Celsius. In the language of the workers, such a simple structure is called a “heating house.” It provides comfortable conditions for finishing in winter and protects from snow and gusts of wind.
The surface of the walls of the house must be dry, without snow or ice. Work in winter is carried out using special masonry mortars, intended for use in low temperature conditions. Under no circumstances should you prepare the solution using hot water.
Contact our team right now, and experienced specialists will help you calculate the amount of work required, its approximate cost and completion time.
We provide a huge range of services for the repair and restoration of facades of residential buildings at an affordable price, namely:
![]() | ![]() |
Prices for facade repairs |
Name of works | Private sector, from rub. | Large volume of work, from RUB. |
Surface degreasing |
||
Applying primer |
||
Painting flat surfaces |
||
Painting stucco |
||
Installation of facade mesh |
||
Welding work |
negotiable |
negotiable |
Drilling holes in reinforced concrete, brick, plastered, wooden walls |
||
Drilling holes in metals |
||
Mechanical cutting of metals at height |
negotiable |
negotiable |
Gas cutting of metals at height |
negotiable |
negotiable |
Prices are current for 2017-2018
Advantages of our company. |
The cost of our work is always competitive in the service market! Ask why? Yes, because we have our own teams and foremen, and we never hire outsiders to carry out this work. We also have our own personal delivery department. We also own our own warehouses and have everything you need in stock construction equipment. When calculating we always We indicate only the Real Price for the material! |
|
Our team consists exclusively of RUSSIANS! | |
Any issues related to various approvals in the ATI, opening orders for scaffolding, approvals with the fire inspectorate, police and many other organizations, our company always resolves AT YOUR PERSONAL EXPENSE! | |
We return the 10% discount to you only in CASH! | |
We always carry out ANY volumes! Even 1m2. |
Every building needs cosmetic repairs from time to time to update the external appearance of the building, without major intervention in the structure itself. Cosmetic work involves only updating particularly critical parts.
The list of services includes:
Cosmetic repairs are often performed exclusively using the repair method.
A comprehensive renovation involves a complete renovation of the front part of the building. This work is performed only by specialists who are trained in industrial mountaineering. Carried out if total area destruction is more than 30%. This method involves painting and plastering, as well as replacing drainage systems.
Major renovation façade always begins with the preparatory work stage:
1. Complete inspection of the facade;
2. Cleaning all façade surfaces from old coatings;
3. Elimination of salts and fungal formations.
The further progress of the work depends on the task set by the customer. This is either plastering with reinforcement, or putty, or painting or decorative finishing facade.
The basement of the building or even the entire facade can be lined with ceramic or porcelain tiles, marble, granite, wild stone, or wild stone tiles or some other decorative and finishing materials.
The list of services also includes:
Restoration of historical buildings. |
Restoration of historical buildings - This special kind repair work on the facade of the building, since this very building has a certain historical value. Restoring the facade of a historic house requires a more thorough and thoughtful approach, as well as the use of specially selected materials.
The company "Alpinists", in addition to professionally performing restoration work on historical buildings, provides guarantee for all work performed, as well as post-warranty repairs .
Carrying out facade work in winter. |
The main enemy when performing facade work in winter is sub-zero temperatures. It negatively affects all work carried out both during “wet” processes and when glazing buildings (when there is a need to open “ warm contour» buildings).
During glazing in winter, there is a high probability that the heating system will defrost and the thermal conditions inside the premises will be disrupted after dismantling the old ones. window designs, doors or stained glass windows. When performing “wet type” façade work, water, which is used in all compositions, begins to freeze at temperatures below +4°C. As a result, compounds that were applied at lower temperatures begin to freeze instead of drying, and this is absolutely unacceptable for high-quality work. To maintain the required temperature conditions, the temperature of the air in contact with the facade must be above +5°C ROUND THE CLOCK.
To comply optimal conditions we create a special thermal circuit. The facade of the building is covered with reinforced polyethylene with ventilation holes, inside temperature regime supported by heat guns that run on gas or diesel fuel.
If openings are opened, we install temporary panels until the translucent structures are installed.
Services from the Mountaineers company mean quality, safety and affordable prices.