Considering projects country houses, developers sooner or later face a choice of which house to build on their suburban area: one-story or two-story. Due to various circumstances related to budget or usable area restrictions on the site, as well as based on the advantages and disadvantages of single-story or two-story houses, and a choice is made in favor of one option or another.

Project two-story house with a balcony covered with siding

Let's take a break and turn to history. At the dawn of the development of the construction industry, humanity simply did not have the knowledge and ability to erect buildings higher than one floor, so all buildings were one-story. In order to provide themselves with a high-quality and reliable home, people used clay. Based on this, the installation of the roof and its maintenance were not accompanied by danger, because for this it was not necessary to climb to the top.

When people acquired tools, a lot changed in life, including in the construction industry. Settlements began to be surrounded by high walls to protect them from hostile neighbors and predatory animals. Accordingly, the price of housing that was under protection increased significantly. This fact contributed to the development of multi-story construction, which made it possible to increase living space in a limited area.


Original project of a house with an attic and a balcony

The development of the construction industry has made it possible to solve all problems with the construction multi-storey buildings, And high-rise buildings Now you won’t surprise anyone. However, despite this, for the development of the private sector, projects of two-story houses of a small area, with a garage, terrace, balcony and other functional features are mainly used.

The key factor when choosing the number of floors of a future private house will be the size land plot. As a rule, if there are not too large areas two-story construction are given greater preference. If on small areas to build, then with the same living area it is possible to occupy the entire land, leaving no room for plantings and outbuildings. An important factor when choosing is visual perception buildings.


Project of a two-story house made of stone and wood with a balcony and terrace
Original exterior of a two-story cottage with a terrace

Now they are located not only on the first floor, as everyone is used to seeing, but also on the second. Houses with a terrace can have awnings and be miniature or very large, on which you can walk. The layout of houses with a terrace or balcony is not only intended for people who are used to not denying themselves anything. There are enough budget projects, suitable for citizens with average incomes.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, and a solution was proposed to move the terrace.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-grill foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered, finishing elements made of wood, manufactured locally, based on technical specifications visualization, painted. The base is laid out decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as the basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace has been installed and finished.

    What was done

    This is the very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - it’s so unusual and stylish solutions It's always a professional challenge!
    We prepared estimates for Ilya and developed unique Constructive decisions- all this allowed us to implement this project! Frame house made using our proven Canadian technology with 200 mm insulation along the entire contour! The outside of the house is sheathed with imitation timber. All windows are made according to individual order and laminated in colors according to the project. Additional accents are placed thanks to professional coloring imitation timber and selection of paints.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge, building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory ones - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, this was precisely the difficult task. They had a foundation from an old burnt house, and a landscaped area around it! A new house had to be built in short term on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a design was made that took into account the old layout, but had a new one modern form with interesting innovations! appeared at home entry group, where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our area. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, built-up roofing and much more. Now in the summer you can have an unusual dinner on such a roof or watch the stars at night! In the decoration, our architect also emphasized the minimalistic and graphic high-tech style. Smooth plastered walls with painted plank details, and wooden beams at the entrance added personality. The inside of the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the site created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the section of country architecture in the high-tech style, a style chosen by brave Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for living that will fit perfectly into their difficult narrow plot! With the advent of children, it was decided to make the dream come true; children grow up quickly and in their own home in nature there are many opportunities and Fresh air. We, in turn, were glad to work on an individual house project in classic style made of red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our current construction site: evaluate the order and construction processes, storage of materials on site, get to know the construction team, make sure the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, masonry with mortar??? Windows have been installed.
    roof: metal tile
    terrace: rough fencing elements have been completed, flooring has been installed.

    What was done

    Dmitry contacted our company with an interesting preliminary design to calculate the cost. Our experience allows us to perform such calculations based on preliminary designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team began to implement a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed stage-by-stage cooperation, namely, upon successful completion of the foundation work, we began the second part of the project - walls + floors + roofing. Also, the exact timing of construction was important for Dmitry; in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was delivered right on time! The result pleased us and the Customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, which benefited all participants in the process!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer’s family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect’s calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden wooden beams, in places of large spans, installation of LVL beams. Basement ceiling insulated with 200mm basalt insulation; interfloor covering with 150mm sound insulation.
    box: box: walls made of expanded clay concrete blocks, masonry with mortar. Windows have been installed.
    roofing: installation of metal tiles.
    external finishing: the facade is insulated with 100 mm basalt facade slabs, the facades are closed facing bricks; color scheme proposed by the architect and agreed with the Customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family to live in!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of the house with exterior finishing and then work on interior decoration! Frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They were pleased with the quality of work on our construction site and the workers who gave us a detailed tour! We also worked on the estimate for a long time, combining different variants finishes, comparing their costs. This allowed me to choose best option from a wide variety finishing materials and complete sets.
    The project was created by an architect friend, but we had to work out the constructive part of it. After which the most reliable and effective foundation- USHP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation 300 mm. For the exterior decoration, siding was chosen in a spectacular combination of colors - coffee and cream. Accents are placed thanks to powerful roof overhangs, an interfloor belt and large windows!

    What was done

    When you decide to become the proud owner own home and move to a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home. He liked the Avignon project and there was already a strip foundation. After the initial visit to the site, measurements and inspection of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the size of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received reinforced concrete floors as a gift, one of the leading construction crews and a house according to the design you liked, standing on a plot with exterior finishing by spring! Alexander observed every stage of construction, regularly visiting the construction site and was pleased with the result, and we were pleased with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding finishing!

    What was done

    Each house is a separate story of creation and implementation! One day we built a house good people and they recommended us to another good person! Rumyantsev Andrey came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings... It was decided to build the house from aerated concrete blocks so that the future country handsome man would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone house construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project in winter months. The main thing is to have the necessary knowledge and constantly replenish it!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer’s family; a terrace and patio were proposed, taking into account the cardinal directions on the Customer’s site.
    foundation: based on geology and the architect’s calculations, the house was built on a pile-and-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a 150 mm sound insulation device.
    box: walls made of aerated concrete blocks, masonry with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tiles.
    Exterior finishing: the walls are insulated with basalt facade insulation and plastered. Based on visualizations added façade panels under the Tolento stone. The enclosing elements of the terrace and balcony are made of wood, made locally, based on technical specifications visualization, and painted. The roof overhangs are lined with soffits matching the color of the roof.

    Vladimir Murashkin,

    The owner of a house “brought to life according to his idea and sketch!”

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas future home, we light up doubly! After all, work on a new stylish project It’s always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot of land with picturesque views of the Oka bank! This view could not be ignored, so an indispensable attribute of the future house was a dizzying terrace (51.1 m2) and large balcony oriented to beauty! Vladimir wanted to relax in nature in wooden house, and it was necessary to build a house in a short time and ideal solution became for such tasks frame technology construction! If we’re going to be different, it’s in everything! The house was made even more spectacular by the vertical finishing of imitation timber made of durable larch, painted in natural shades with emphasized wood texture. Laminated windows complement the modern look of the house! It turned out to be an excellent country house, with highlights and at the same time incredibly functional.

    It all started with individual project, found by the Customer’s family on a European website. It was with him that she came to our office for the first time. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and work began to boil! The architect improved and adapted the project to the site and the Client’s family; the foreman “planted” the house on the site. Based on geological surveys, it was decided to place the house on bored piles. The frame grew in a few weeks, then the roofing, insulation, exterior finishing! Behind winter period a house grew on the site. The customer invited a third-party technical supervisor who monitored the process independently of our multi-stage control. The color scheme for painting the imitation timber was selected by our manager and here in front of us is the bright and cozy country house of the Pushkov family’s dreams!

When owners of suburban areas choose house designs, they strive to maximize the living space through various techniques. It is for this reason that houses with a terrace and a balcony are especially popular, because these functional additions allow you to temporarily or permanently remove some living areas from the rooms. The design company “Svoy Dom” in Moscow offers many interesting solutions For suburban construction, including a wide range of houses with a terrace and balcony at an affordable price.

Houses with a terrace and balcony - features

The balcony, unlike the loggia, is not in the same plane with the facade of the house, but protrudes forward, thus adding usable area. The size of the balcony depends on your preferences. For example, if you plan to equip a full-fledged work room or dining area there, you should choose a larger balcony. You can also take out some functional premises to the terrace.

Terraces and balconies are:

  • open - suitable for use only in warm time of the year;
  • closed (glazed) - suitable for use all year round.

Even if the terrace is glazed, in the warm season it can let in a large number of natural light, and large glazed doors can always be opened and let fresh air into the house. The same goes for the balcony. These building elements allow for a smooth transition between interior spaces and the surrounding nature, as if uniting them.

If you are looking for quality and current projects, completely ready for use, contact the architectural bureau “Svoy Dom” in Moscow. We work for you!

A balcony is one of the architectural elements of a private house, which is not mandatory for implementation. Many believe that a balcony is superfluous in two-story houses, while others are sure that there are many difficulties here. However, with the help of a balcony, you can make your home more interesting and attractive by replacing the terrace with a modest balcony. With the help of this architectural element of the building, you can not only replace large verandas, but also organize cozy corner for outdoor recreation.

Advantages and disadvantages

Any architectural element or structure has both positive sides, so negative points, the balcony was no exception to the rule. Before you start building a house, you need to develop its design, take into account all the pros and cons, and then decide whether two-storey house with or without balcony.

Positive points:

  • The balcony area can be equipped and used as extra living space.
  • A chic exterior, a balcony can become a real decoration of a two-story house.
  • Easy access to fresh air. On the balcony you can sit surrounded by nature, admire the landscape with a cup of coffee, or have casual conversations. This is also a great opportunity to be outdoors for people with disabilities.
  • Based on the design, a balcony can be an element of a porch, part of a veranda or the roof of a house.
  • Can be used as an emergency exit in case of emergency.

Now let's talk about the disadvantages:

  • If the house has already been built, then adding a balcony to it is very expensive.
  • A hanging balcony is a rather dangerous element, since incorrect calculations can lead to collapse and possible injuries.
  • Heat losses. Whatever it is, the wall of the house protects the house from the cold much better than the balcony door.



Open balcony

For private houses, an open balcony is often used - a base plate with some kind of fencing. A similar architectural element is decorative look, Special attention here they pay attention to the style of the balcony and the materials for its construction. The most popular and stylish option– open balcony with wrought iron fencing.

Features of forged fencing:

  • The dimensions should be no larger than the size of the base plate.
  • Before installation, you need to evaluate the power reserve of the slab and its condition, since metal fencing has impressive weight.
  • If the supporting slab has defects or errors, then the fence can be installed only after the deficiencies associated with the strength of the support have been eliminated.


Closed balcony

Overall the main difference open balcony from closed is glazing that protects the architectural element from unfavorable external factors in the form of wind, rain and snow. Thanks to glazing, functionality increases, because here you can relax in both winter and summer, creating an entire living space.

A closed balcony will protect residents from annoying birds or insects, improve sound insulation and enable a true housewife to organize a small winter Garden. Depending on the type of glazing (partial, stained glass, panoramic), you can implement any ideas and design the façade as attractively as possible.


Balcony design

The appearance of the balcony of a two-story house can be anything, but here it is structural elements are the same for all balconies. Parts required for use:

  • A base plate that bears the entire load.
  • Parapet (a restriction that protects a person from falling, can be made of any building material).
  • Decorating elements (roof, canopy, panoramic windows, etc.).

As already mentioned, it is the base slab that is the main element of the balcony; it is made of wood or reinforced concrete. Wooden base It is lightweight, so it can be used on the facades of any house. Reinforced concrete structure has an impressive weight, so such a balcony can only be installed on durable houses made of stone, brick or blocks.

Depending on the method of fastening the base plate, balconies are divided into the following categories:

  • Pinched in a wall with a cantilever beam (suitable only for a reinforced concrete base, since it is recessed into the wall during the construction of a house, the overhang should be no more than a meter).
  • Cantilever slab with supports on beams (in this case, it is not the base that is recessed, but the beams on which a slab of wood or reinforced concrete is placed). In this case, the overhang of the structure can be 1.2 meters.
  • Slab supported on brackets triangular shape– a good option when the balcony serves as an extension to the finished building.
  • Slab on supports. In this case, the balcony is not part of the building, but stands as close as possible to the facade of the house, resting on walls or columns.


Options for the location of balconies of two-story houses

In most cases, the balcony is located at the front of the house façade so that it becomes the central element of the building and has common roof from houses. This option is an ideal solution for small houses, you can relax here both in winter and in summer; if you take out the table and chairs, you can build a small dining area in the fresh air.

An interesting solution would be a triangular-shaped log balcony under the roof of the house. You can position the balcony in such a way that the balcony slab acts as a roof for the veranda or porch. If there are no special requirements, then the balcony can be positioned as your heart desires.


Canopy or roof

The top cover is not mandatory element balcony, but with its help you can make the space more functional and reliable. Visor – simple design curved shape, protecting the balcony space from wind, rain and snow.

The roof is a more reliable and expensive option; its dimensions should be such that the roof protrudes slightly beyond the load-bearing slab of the balcony and has an inclination angle so that snow does not accumulate on its surface. In general, both options are quite good; only the homeowner can decide which one to use, depending on his financial capabilities.