The 6 by 6 bathhouse project is best option, as it can even accommodate a swimming pool. All rooms are spacious and roomy. A bathhouse made of 6x6 timber with a terrace will be ideal option For big company. IN summer time you can relax on fresh air, hiding under a roof in the shade or from the rain.
Let's take a closer look possible options layouts:
Projects of two-story buildings increase the space for recreation. The room is smaller than the first floor, as it is located under the roof. On the second floor of the project there is a balcony and two rooms.
Construction wooden baths does not provide for a deep foundation. The weight of the materials allows the use of a tape base.
Timber technologies offer a choice of:
A layout of 6 by 6 m is the most optimal for baths made of timber. The square footage of the premises allows for a large company to be accommodated.
A bathhouse made of profiled timber from the Russian Spaces company is easy and quick to assemble, looks aesthetically pleasing, and will serve you for many years.
Our manager will advise on all issues and help you choose a project that suits you or make changes to an existing one.
The cost of building a log bathhouse 6x6 without finishing under the roof is 284,000 rubles
The price of a turnkey 6x6 bathhouse with a foundation and stove is 433,000 rubles
We have compiled for you a convenient table of differences in the configurations of bathhouses for shrinkage and turnkey.
CONSTRUCTIVE |
SHRINKABLE |
FULL CONSTRUCTION |
Columnar foundation made of concrete blocks 200*200*400 |
Yes |
Yes |
Double strapping made of timber 150*100 mm |
Yes |
Yes |
Floor joists made of boards 40*150 per edge with a pitch of 600 mm |
Yes |
Yes |
Subfloor made of boards 22*100/150 mm |
No |
Yes |
Floor insulation with hydro and vapor barrier |
No |
Yes |
Finish floor – dry tongue-and-groove floorboard 36 mm |
No |
Yes |
Walls and partitions made of profiled timber of natural moisture with a cross-section of 145*90 mm (wall thickness – 90mm) |
Yes |
Yes |
Assembling a log house on steel dowels |
Yes |
Yes |
Corner connection - half a tree |
Yes |
Yes |
Intercrown insulation - jute |
Yes |
Yes |
Rafters - trusses made of timber 40*100/150 mm with a pitch of 900/1000 mm |
Yes |
Yes |
Sheathing – board 20*100/150 mm |
Yes |
Yes |
Roof covering– ondulin / galvanized corrugated sheet C20 |
Yes |
Yes |
The eaves and roof overhangs are lined with spruce/pine AB clapboard |
Yes |
Yes |
Window and door openings with a dressing crown, without installing casing bars |
Yes |
No |
Window and door openings with installation of casing bars |
No |
Yes |
Installation of windows and doors |
No |
Yes |
Ceiling lining – spruce/pine lining AB |
No |
Yes |
Insulation + vapor barrier of floors/attics |
No |
Yes |
Finishing the walls and ceiling of the attic - spruce/pine lining AB |
No |
Yes |
Finishing the walls and ceiling of the steam room - aspen lining AB + shelves |
No |
Yes |
Installation of stove and chimney |
No |
Yes |
Installation of a shower tray 800*800 mm with a siphon in a washing room. Exiting the drain outside the perimeter of the bathhouse |
No |
Yes |
Stairs to the attic |
No |
Yes |
Finishing: plinth, platbands |
No |
Yes |
Loading a set of material, delivering it up to 400 km from our base, unloading at the customer’s site |
Yes |
Yes |
Name |
Cost, rub) |
Unit |
Construction of the foundation for screw piles or reinforced concrete foundation |
8-921-930-69-80, |
|
Decorative finishing plinth - pick-up () |
1000-1600 |
linear meters |
Installation of reinforced concrete slabs 500*500*100 mm for support pedestals ( ) |
PC. |
|
Protection (backing board) of the first row of strapping made of larch boards 50*150 mm ( ) |
linear meters |
|
Protection (backing board) of the first row of strapping made of larch boards 50*200 mm ( ) |
linear meters |
|
Double strapping made of timber 150x150mm |
linear meters |
|
Double strapping made of timber 150x200mm |
linear meters |
|
Installation of floor joists made of timber 150x100mm |
linear meters |
|
Installation of floors from larch decking boards “corduroy” (for open terraces)() |
2000 |
m*2 floors |
Installation of finished floors from tongue-and-groove larch floorboards 27 mm ( ) |
2000 |
m*2 floors |
External walls made of profiled timber are moisture resistant with a cross-section of 145x140mm, partitions are made of profiled timber. humidity section 145*90 mm |
2500 |
linear meters external walls |
External walls and partitions made of kiln-dried profiled timber with a cross-section of 145x90 mm |
2300 |
linear meters external walls And partitions |
External walls made of profiled kiln-drying timber with a cross-section of 145x140 mm, partitions made of profiled kiln-dried timber with a cross-section of 145x90 mm |
4000 |
linear meters of external walls |
The outer walls are made of profiled timber. humidity with a cross section of 145x190mm, partitions made of profiled timber. humidity section 145*90 mm |
4500 |
linear meters of external walls |
External walls are made of profiled chamber-drying timber with a cross-section of 145x190 mm, partitions are made of profiled chamber-drying timber with a cross-section of 145*90 mm. |
5300 |
linear meters of external walls |
Set of kiln-dried lumber ( ) |
1000 |
m*2 building area |
Pairing crowns with a wooden dowel |
1000 |
|
Assembling a log house using a SPRING UNIT FORCE ( ) |
2000 |
linear meters external walls and partitions of the log house |
Assembling a log frame with the height of the crowns tied with steel studs |
1500 |
linear meters external walls and partitions of the log house |
Corner groove-tenon connection ( warm corner) |
6000 |
one corner of the log house |
Corner connection “into the bowl” ( ) |
from 30 000 |
house kit |
Inter-crown insulation – holofiber() |
300/450/600 |
linear meter external walls of the log house |
Increase in ceiling height by 14cm (+ one crown in the log house) |
500/750/1000 |
linear meters external walls and log partitions |
Insulation 150mm |
m*2 insulated area |
|
The construction of a staircase on strings made of laminated veneer lumber, with wide steps, turned pillars, balusters and a figured handrail. |
25000 |
PC. |
Roof covering – metal tiles RAL 3005,5005,6005,7004, 7024,8017) |
m*2 roof |
|
Roof covering – corrugated sheeting with polymer coating (RAL 3005,5005,6005,7004, 7024,8017) |
m*2 roof |
|
Installation of a drainage system (PVC, DEKE) |
1200 |
linear meters roof slope |
Installation of corner snow barriers ( ) |
linear meters roof slope |
|
Construction of tubular snow barriers ( ) |
1300 |
linear meters roof slope |
Attic structure: sparse flooring made of edged boards By ceiling beams, door in one of the gables + dormer window in the opposite gable |
m*2 ceiling |
|
External finishing of gables – house block spruce/pine AB 28*140 |
m*2 gable area |
|
External finishing of gables - imitation timber 18*140 mm |
m*2 gable area |
|
Treatment of the entire building with fire-bioprotective composition NEOMID ( ) |
m*2 building area |
|
Surface treatment with oil for terraces NEOMID ( ) |
m*2 floors |
|
Treating the walls and ceiling of the steam room and washing room with NEOMID varnish “for baths and saunas” ( ) |
m*2 walls and ceiling |
|
Treatment of the ends of the log house with NEOMID TOR PLUS ( ) |
opening/corner |
|
Treatment of shelves in the steam room with NEOMID oil ( ) |
1000 |
m*2 shelf |
Wall and ceiling finishing washing clapboard larch 14*90mm ( ) |
1500 |
m*2 walls and ceiling |
Installation of a “leaky floor” in a washing room ( ) |
5000 |
m*2 floors |
Finishing with paired lining OSIN A, including shelves - OSIN A |
m*2 walls and ceiling |
|
Finishing with paired lining LIPA A, including shelves - LIPA A |
1200 |
m*2 walls and ceiling |
Finishing with paired lining LIPA EXTRA, including shelves - LIPA Extra more details more details) |
35 000 |
PC. |
Installation of PVC windows with single-chamber double-glazed windows |
from 4000 |
PC. |
Installation of PVC windows with double-glazed windows |
from 5000 |
PC. |
Installation of a heat exchanger in the ERMAK furnace, installation of a remote tank (stainless steel 60 l) on the wall of the washing room, water supply hot water metal-plastic pipes |
20000 |
PC. |
Installation of a tank (stainless steel 50 l) on a pipe above the stove, with a tap leading to the washing room |
13 000 |
PC. |
Installation of another ERMAK furnace ( |
12 000/16000 |
set |
Chimney device from of stainless steel 0.8 mm thick (included) protective screen, stainless steel flood sheet) |
16 000/20000 |
set |
Delivery over 400 km from Pestovo, Novgorod region. |
km |
|
Construction shed 2.0*3.0 / 4.0 m () |
from 21 000 |
PC. |
The whole country rests on such workers
Alexey Gennadievich!!! Due to lack of time, I couldn’t write to you - thank you very much for the work of your employees in building the bathhouse, two young men, unfortunately, I don’t know their names, they worked clearly and harmoniously, the quality of the bathhouse is EXCELLENT!!! The whole country rests on such workers. All our friends and relatives also noted the impeccable work of the guys, which resulted in the bathhouse we dreamed of.
The guys built us an amazing bathhouse
I would like to express my deep gratitude to Alexey (general director), Sergey Zorin and Vladimir Chistyakov (builders)! At the beginning of August, the guys built us a stunning bathhouse, taking into account all our wishes. The delivery of materials was carried out on time, the construction was completed even ahead of the time agreed upon earlier, the quality of materials and work was excellent top level. In general, just a fairy tale! I advise you to build only with Russian carpenters!
"Price quality"
The work is pleasing to the eye. Fast, high quality, on time. I thank the team of guys (Evgeny, Dmitry, Sergey) and general director Alexey Roslov for the work done. I ordered a bathhouse with a 6x6 attic, project B-20, with minor changes, “for shrinkage”. All work has been completed ahead of schedule and high quality. All my wishes were taken into account. I was very pleased with Alexey Roslov’s attitude towards his work. He always promptly and competently answered all my questions and resolved controversial issues. The team, despite the young age of the guys, worked quickly and smoothly, and at the end they gave advice on caring for the timber and preserving it for the winter. Next year I will do the finishing with the same team. "Russian Carpenters" wins in all respects compared to other large companies. “Price-quality” is about them. Again Thanks a lot. I will recommend it to everyone.
They built a house for me in 2018, according to my design, by professionals in their field. The project itself is somewhat more expensive compared to its competitors, but in our village they built one more house and the owners were satisfied.
We ordered the construction of a bathhouse, they completed it in the shortest possible time, without any complaints about the work of the team.
The full cycle from material production to house assembly is organized perfectly. Quality and professionalism at the highest level. I recommend.
It is very important to find your own manager who will advise not only when concluding a contract, but also during construction. We talked with Igor, as a result, the bathhouse is ready on the site, we are using it, everything is fine. Thank you.
Great houses, great service! They told us everything and helped us with the choice. You can see everything live - we went to a facility under construction roughly similar to ours, where we saw how they work, only after that we decided to build. We thank the managers and builders for their patience in answering all the questions!
In 2018 we ordered a bathhouse. We are very pleased with the work of the employees of this company. Starting with the estimate and ending with the construction team. We were lucky because of the promotion and received a sauna stove as a gift!
Thank you for the house with a sauna. The website lists some prices, but in reality it turns out to be more. But it’s understandable that the price indicated is for the very minimum, like everyone else on the Internet, if you want comfort, pay extra for extras. In general, “thank you” to the builders.
For big family and medium-sized families we offer bathhouse projects most suitable size – 6X6 meters. A bathhouse of this size will allow you to freely accommodate all family members and invited guests to spend an exciting evening. If the project includes a second floor and an attic, then the owners will not have problems accommodating guests for the night. At the same time, the price for such a bath will be as affordable as possible.
We offer a wide variety of projects log baths or from a log, sufficient space in the premises allows you to develop a project that is not only functional, but also quite attractive. Its main decoration can be a veranda, where it is pleasant to sit in a close family circle with a samovar after the steam room, or a swimming pool, which allows you to fully appreciate the coolness of the water. More often bath room is divided into several functional departments. This could be a dressing room, a steam room, a washing room and a relaxation room. However bathhouse projects in Moscow, where the rest room is combined with a dressing room, also look very attractive.
We offer projects where the area of the steam room is most often slightly larger than the dimensions of the washing room. At the same time, a stove-heater is installed in the steam room and the floor is in two tiers. In the washroom, at the owner’s request, you can install a font, a shower tray, and the currently popular oak barrel, intended for spa treatments. The rest room provides space for comfortable table and a sofa. Layout 6 by 6 m allows you to provide a bathroom, the arrangement of which will require no more than 2 m 2.
Variety of bathhouse design options 6X6 provides for the arrangement of a terrace, but if the terrace is abandoned, then a small swimming pool can be placed in the room. And although when developing such projects we recommend slightly reducing the area of the washing room or recreation room, or as an option to combine a pool and a recreation room, having your own pool that can be used in the cold season is worth it. If order bathhouse with a bathhouse project with a swimming pool, then it would be useful to equip a cornice overhang with access to a small courtyard, which can partially replace the terrace
The price for a turnkey log bathhouse 6 by 6 on two floors will be the same as for a turnkey log bathhouse 6 by 6 on one floor, so you can choose the bathhouse that is right for you. When developing such buildings, the specialists of the Tsar Bani company must take into account the features of the landscape and appearance main estate, which allows the bathhouse structure to fit perfectly into the space of the site.
Two-story baths allow you to equip them on the second floor extra room relaxation with pool table or guest room. Look great log sauna projects with a small balcony where you can set up a place for drinking tea.
In our company you can order 6X6 bathhouse projects turnkey, which will ideally fit the space of the site. Our company’s specialists will help you create a bathhouse that will ideally match the landscape of the site in accordance with the customer’s budget.
When constructing a building from a log or a log frame, we carry out every stage of construction, from project development to finishing works. After completion of construction, we hand over a completely finished building, which will not need to be completed.
A spacious sauna is the dream of any steam lover. The size and dimensions of the building largely depend on free space on suburban area or dacha.
Popular size for spacious personal plots is a 6x6 m bathhouse.
The design of a 6x6 m bathhouse is quite simple and unpretentious. However, externally such an object looks solid, spacious and “our way.” The resulting structure is functional inside; it can be divided into several isolated rooms, including a walk-through recreation area.
The advantages of the dimensions of a 6x6 m bath are:
For a bathhouse of this size, you can consider a project with an upper attic floor and a balcony, which will allow you to allocate space for a guest room or, for example, for billiards. This bath size is optimal and comfortable for simultaneous use by several people (up to 8).
If you count on frequent use such a bathhouse with fewer people (for example, if we're talking about about a young family), it is important to consider that the bathhouse must be constantly heated. How bigger room, the longer it will take to heat it up and waste fuel resources(wood or gas with water supply system).
When choosing a material, you should take into account its availability, as well as the characteristics of the building. The choice is wide; the technology for constructing a bathhouse depends on the choice of material.
At all times, the most popular material for the construction of baths in Russia was natural wood. A log house was made from round logs, which had all the necessary qualities for a real Russian steam room.
These include:
Chopped sauna has a nice aesthetic appearance and smell when heated inside. This material allows you to implement various projects, including with an attic floor. Wood has good level natural ventilation, such material “breathes”. At the same time, there is always the opportunity to purchase a ready-made log house. Among the disadvantages of a log house, several negative factors can be identified.
Besides increased risk fire, wood releases moisture over time:
To reduce the impact negative factors, the wood is subjected to special treatment. Antiseptics against mold and impregnations against rotting are used before construction begins..
To create a certain stylistic unity on the site, the log house can be decorated with decorative building materials. For example, it can be plastered, lined with brick, or lined with stone. Country style or country music does not need external transformation.
But such an object has a number of negative factors:
To insulate and insulate floors, it is necessary to use special expensive polystyrene foam and cotton wool, which do not emit toxic substances when heated strongly, and are also not afraid of high humidity. The insulated foundation should be covered quickly, otherwise under the influence environment it may lose its properties and deteriorate.
One person cannot take part in the construction of a bathhouse, since many of the elements are quite voluminous and heavy. Frame baths cannot be named budget option, even thanks to the absence of significant expenses on the foundation. However for those who are in a hurry to complete construction and start enjoying the finished building, this option is ideal.
Not the most popular brick baths. When assessing the pros and cons of such buildings, it is rare that the choice is in favor of such building materials. Before building such a bathhouse, you should evaluate the positive and negative aspects.
The advantages of brick and buildings made from it include:
This building material does not support fire. Mold and mildew do not grow on brick, so it is not required to be treated with special antiseptics. Such buildings do not rot, these baths retain heat for a long time.
Disadvantages of brick baths:
The brick takes a long time to heat up, such a bath will have to be heated in advance or it is necessary to think through the system internal thermal insulation, which is another costly job. If you have access to cheap material, and also want to build a complex architectural structure, building a bathhouse made of brick is justified. In any other case it does not seem appropriate.
Reviews about block baths vary. Some craftsmen recommend this alternative in construction, but many are disappointed in the final result. To decide on such a building, it is worth assessing its advantages and disadvantages.
Let's consider the advantages:
It also has disadvantages:
Waterproofing is required inside, but the sealant composition in most cases contains chemical elements, which can become volatile and poisonous when exposed to extreme heat.
Considering such subtleties, It is better to build a spacious bathhouse 6x6 m from a material more suitable for this purpose. Aerated concrete blocks Since they are a relatively young material, it is difficult to fully assess the performance of such baths and their durability.
The construction of any bathhouse should begin with a plan. There are many options for how to organize a partition diagram in a 6x6 m bath. To draw a drawing diagram, you should decide on architectural style and desired fullness.
There is a list of premises that must be included in the layout, these are:
If you manage the space correctly, you can include other rooms that will expand the functionality.
This is the simplest project; in addition to a standard set of premises, it can include a terrace or terrace and a bathroom. For the convenience of changing clothes, the building can be equipped with an entrance hall or closed veranda.You can expand the space inside by abandoning the terrace in favor of a small porch.
For a one-story building, a hip roof is perfect hipped roof . The process of installing such a roof is not very simple, but it will perfectly withstand a large mass of snow, is resistant to strong and hurricane winds, and looks good. The building will not be high, thus it will not clutter up the site.
Get additional area It’s possible if you manage the space under the roof wisely. On the attic floor you can place one or two guest rooms, open space for pool table, large plasma TV and comfortable armchairs and sofas. The presence of sleeping places expands the functionality of the building, allows you to accommodate guests, and if the main residential building is still under construction, the bathhouse can become a temporary home for the owners. Two-story bath houses are not uncommon today.
Taking these parameters into account, you can plan a convenient building for these purposes, which will include the following premises:
To save space, a screw or corner staircase. For attic floor gable is better suited sloping roof. For a two-story building, a hip roof is preferable.
Additional rooms or objects in the baths can be: