Starting a repair or installation floor covering, it often becomes necessary to level the surface and fill the screed, which will be the basis for the final finishing of the future floor. This responsible event must be carried out in full accordance with the technology. It is important to know how to calculate the material for the screed without errors in order to avoid unnecessary cash costs.

Calculation of the required amount of materials

When a floor screed is being installed, it is not difficult to find out the material consumption.

Calculations are made in the following order:

  1. Let's say you want to calculate a floor screed 5 centimeters thick for a surface whose area is 40 "squares". IN this case 40x0.05 = 2 cubic meters of the mixture will be required.
  2. Further, in accordance with the ratio of 1: 3, you can find out the required amount of cement and sand. In this example, there will be cement - 0.5 cubic meters and sand -1.5 cubic meters.
  3. True, in cubic meters it is not very convenient to calculate the amount of sand concrete for screed, so they should be converted to kilograms. Since the average weight of a cube of cement is 1300 kilograms, we get: 0.5x1.3 \u003d 6.5 or 650 kilograms.


Using the screed calculation example above, you can determine the amount of materials for each room by substituting the data into the formula. It must be remembered that in the process of preparation, the composition for pouring tends to decrease in volume. To find out how much floor screed mixture is needed, you need to know that 0.69 cubic meters of solution is obtained from its cubic meter. This means that you will have to adjust the amount of building materials.

Composition of screed solutions


Typically, the composition of the solution for pouring the screed includes:

  • cement(most often use M400);
  • sand, from which debris, shells and pebbles are removed by sieving. It should not be wet before making the mixture;
  • plasticizer, which improves the properties of the material;
  • additives(mineral and polymer), endowing the mixture with various properties. So some of them speed up the hardening process, others contribute to leveling the surface or facilitate the finish.

Mixtures are also commercially available in which gypsum is the binder rather than cement. Such a composition is distinguished by the fact that it dries faster, almost does not shrink, and it is applied even in a thin layer. But gypsum also has a drawback - it is less resistant to moisture, so this composition is used exclusively for dry rooms, for example, for living rooms.


Experts advise: when purchasing cement, carefully look at the date of release of products, since when long-term storage the material begins to absorb moisture, as a result of which the brand of goods decreases.

Of course, buying a completely ready-made mixture is easier than making it yourself. In addition, thanks to the information from the manufacturers on the packaging of the product, you can easily understand what specific work the composition is intended for. At the same time, the cost of the finished mixture is much higher than for cement.

Preparation of screed solutions

The duration of the service life of the coating and its appearance depend on how well the solution for pouring the screed will be prepared.

When the amount of the mixture for floor screed has been calculated and building materials have been purchased, they begin to prepare the solution in the following sequence:

  1. Dry components (cement, sand and, in some cases, fillers) are mixed in a special container. In this case, you should adhere to the desired proportion, which is indicated on the manufacturer's packaging. For example, cement grade M400 is mixed with purified sand in a ratio of 1: 3 (more details: "").
  2. In another container, the liquid components are mixed (plasticizer plus water). Usually, 190 grams of plasticizer should be added to a 50-kilogram bag of cement. As a result, the liquid should be a third of the weight of the cement.
  3. When all the components (liquid and dry) are prepared, they begin to mix them. A mixture of dry materials is poured into the liquid gradually and thoroughly mixed until the mass becomes a homogeneous consistency without the slightest lumps.
  4. To make the solution easier to prepare, use power tools, such as a drill with a nozzle or a special mixer, in which case the mixture will turn out better.

Stages of arrangement of the screed

When creating a base for flooring, the weight of the floor screed is of no small importance, depending on the condition. interfloor overlap. In old buildings with wooden lags the concrete base is not laid now.


Filling the screed, such as in the photo, is done in stages:

  • prepare the subfloor;
  • install beacons;
  • knead the solution;
  • pour the mixture.

Naturally, before starting work, you should correctly calculate the dry mix for floor screed.

Preparatory process

In preparation for pouring the screed:

  • cracks and chips are eliminated on the surface of the base;
  • remove dust and debris;
  • apply a primer, which is selected depending on the type of surface.

Fixing beacons for screed

Lighthouses are located in one horizontal plane of the floor. Such beacons for leveling the floor are special landmarks from guide rails. It is along them that in the process of filling the fill is carried out by the rule and thus a smooth and even surface is obtained.

The installation of beacons should be done carefully and accurately, since the horizontalness of the base for finishing. Guides can be made from a special aluminum profile.


Beacons are mounted in a certain sequence:

  1. Determine zero level, usually it is 5 centimeters above the highest point on the surface of the rough base.
  2. At a distance of 30-40 centimeters from the walls, a line is drawn, at the ends of which holes are drilled with a puncher, chopsticks are placed in them and self-tapping screws are screwed in so that their caps are at zero level.
  3. Then a profile is placed on the hats and a rule is applied to it. If necessary, adjust the height of the screws to achieve a horizontal profile.
  4. The strong position of the beacons is ensured by means of a large number gypsum mixture. The gaps between the landmarks should not exceed the length building rule plus a 10-20 cm margin on each of its sides.
  5. After fixing all the beacons, using a level, once again check the horizontalness of the base surface in all directions.

Filling the screed for the floor

IN last years sand concrete is used to prepare the solution. It is a mixture of Portland cement, various additives (mineral and natural) and sand.

After it has been calculated how many bags of sand concrete are needed for the floor screed and the solution has been prepared, as well as beacons have been installed, you must immediately start pouring.


The mixture is laid out in strips, focusing on the guides. With smooth movements, they carry out the rule along the slats towards themselves, moving from the wall opposite the entrance.

After the solution has set, the beacons are dismantled, and the strips from them are sealed with a solution and leveled with a spatula. The presence of protrusions or depressions is indicated by light spots that appear on the surface. cement screed, which eliminate the solution and the rule.

concrete base should dry well. It is necessary to understand how much the floor screed dries, so as not to spoil the work done. During the first 10 days, its surface should be moistened with water so that cracks do not occur.

Arrangement of a dry screed

This technology differs in many ways from traditional concrete screed, since its implementation does not require the use of cement and the so-called "wet" work.

To equip a dry screed, you will need the following building materials:

  • waterproofing;
  • heat-insulating, for example, expanded polystyrene plates;
  • loose (fine-fraction slag, expanded clay, sand);
  • boards (chipboard, moisture-resistant GVP, asbestos-cement).

Before starting work, you need to calculate the bags for the screed and other materials listed above.


The creation of a dry screed is carried out in stages:

  1. Laying a layer of waterproofing and thermal insulation.
  2. Backfill bulk materials and their ramming.
  3. Plate installation.


The cost of arranging a dry screed depends on the type of materials used. It is laid only in dry rooms.

The floor screed is integral part residential, technical or production premises. At the same time, the floor screed can serve as the basis for the flooring of the finishing coating and as a “finishing” coating for utility and industrial premises.

material calculation for square meter gender depends on many factors.

Calculation example for a classic floor screed

Earlier, we have already considered in detail. Before moving on, for example, to calculate the amount of cement and sand per floor screed for a particular room, a number of assumptions should be made:

  • Screed thickness. According to building codes and regulations minimum thickness reinforced floor screed is 2 cm, maximum thickness non-reinforced screed general purpose- 4 cm. We take into account the thickness of the layer - 4 centimeters, as the most optimal and common option;
  • Solution brand. Recommended brands of solution: M150 or M200;
  • Recommended brands of cement - Portland cement M300, M400 or M500;
  • The calculation of cement and sand is carried out in kilograms per 1 cubic meter of mortar for pouring the screed;
  • The calculation of the filling volume is carried out in cubic meters. In other words, the length and width of the room, as well as the thickness of the screed layer, are measured in running meters.

So, how much cement is needed for floor screed, poured with M200 cement-sand mortar (proportions of cement and sand 1: 3), based on M400 cement, single-layer, 0.04 m thick for a room of 4x3.5 meters?

We calculate the poured volume: 4x3.5x0.04 = 0.56 m3. To calculate cement, we use the table of the amount of binder per 1 m3 for mortar grades M150 and M200, based on cement: M300, M400 and M500:

Grade of cement Solution grade
M150 M200
Cement Consumption of cement per 1 cu. m solution
M500 330 kg 410 kg
M400 400 kg 490 kg
M300 510 kg

As follows from the table, 490 kg of binder (cement) are needed to prepare 1 m3 of M200 brand mortar based on M400 cement. Since we need to prepare not 1 m3, but less - 0.56 m3, the following arithmetic operation should be performed: 490x0.56 = 274.4 kg of M400 grade cement is required to prepare the M200 solution, to fill the floor screed 4 cm thick in a 4x3 room, 5 m

Calculation of the amount of sand based on the above proportion 1 part of cement to 3 parts of sand (moisture content not more than 7%): 274.4x3 = 823.2 kg of sand, required for the preparation of a cement-sand mortar for pouring a 4 cm thick floor screed in a 4x3 room, 5 m

In a similar way, you can calculate the number of components for any thickness of the screed, for rooms of any size - multiply "your" length and width of the room and "your" thickness of the screed layer in meters. Using tabular data, determine the amount of cement, and then determine the amount of sand based on the proportions.

Helpful advice! To increase the wear resistance of the screed, it is especially important for the “finishing” floor screed, without fail, carry out ironing of its upper layer.

The hardware technology is as follows:

  • Immediately after pouring IMPORTANT! and leveling the layer, sprinkle the surface of the screed with clean dry cement with a layer of 3 mm;
  • Sprinkle the surface with water until the cement is completely wetted;
  • Lungs in a circular motion with a flat grout or trowel, rub the cement into the surface, which should take on a uniform dark green shade with a “blue”.

Thus, a hard, wear-resistant and very durable crust is formed on the surface of the screed, which reliably protects the screed from abrasion and other mechanical influences.

Present to your attention, online calculator floor screeds, this program is indispensable for builders, especially those who prefer to do everything by hand. Perhaps, for a master who does similar work every day and it will not be difficult to calculate on a piece of paper, as needed, sand, cement mixture and water to form the required amount of solution. But most often, in order to calculate the cement for the screed, even a professional will need to look into the directory. Our online calculator allows you to quickly and easily maximum precision determine the required amount building material and save even at the planning stage.

Calculation of floor screed taking into account differences

  • It is necessary to measure what difference in each corner of the room in relation to the upper point "0";
  • The calculator will calculate and display the desired value.
  • The savings are there...

More about the screed:

A screed is a layer of floor covering (most often a cement-sand mortar), which serves to level the surface and stiffen it. The screed can be both reinforced and without a reinforcing cage, depending on its thickness and load, which will later be distributed to the floor covering.

The usual (standard) composition of the screed is a cement-sand mixture, in other words, it is cement mixed with sand and water in certain proportions. Not many people know that if you mix the solution without observing the right proportions, then this can lead to sad consequences, for example, if the amount of sand is significantly reduced, the screed will become very brittle and this will lead to the fact that it will begin to crumble and peel off.

In order to avoid such consequences, we have developed a floor screed calculator. With the help of the data obtained, you can easily independently calculate the necessary building material, mix the mixture and perform the installation.

What brand of mortar to choose for the screed?

Screeds are different: leveling, for underfloor heating, for a garage, for a basement, etc. Of course, a leveling screed cannot be made from the same mortar as a garage screed, because the loads are different. But in order not to complicate things, you can resort to generally accepted rules:

The brand for all ties should be M 100-200, for garages and rooms with a large "pressure load" M 200-300. The table shows the ratio of cement and sand in the mortar for screeds, for convenience translated into volume. In other words, 1 bucket of cement / 3 buckets of sand is a universal recipe for a good solution.

This online calculator is designed to calculate not only the cement-sand mixture. If you plan to use ready-mix, with this program, you can determine in advance the amount that you will spend on when laying. This will allow you to account for all costs in advance.

Sometimes, in order to perform a complete calculation of the floor screed, it is necessary to take into account not only the mixture, but also the reinforcement cage. Most often, a finished mesh is used in a screed for reinforcement. And not everyone knows the rules of its device, desired diameter and overlap. This online calculator allows you to calculate the number of reinforcing meshes you need. This will also allow you to take into account the additional costs of arranging the floor screed at the planning stage.

Personal data processing policy

Saint Petersburg

This Personal Data Privacy Policy (hereinafter referred to as the Privacy Policy) applies to all information that "styazhka-pola" located on the domain name //styazhka-pola..

1. DEFINITION OF TERMS

1.1. This Privacy Policy uses the following terms:

1.1.1. "Administration of the site" styazhka-pola "(hereinafter referred to as the Site Administration)" - authorized employees to manage the site, acting on behalf of the site, who organize and (or) process personal data, and also determine the purposes of processing personal data, the composition of personal data, subject to processing, actions (operations) performed with personal data.

1.1.2. "Personal Data" means any information relating to a directly or indirectly identified or identifiable to an individual(subject of personal data), which the user provides about himself when registering (creating an account) or in the process of using the Services, as well as data that is automatically transmitted to the Services in the process of using them using the software installed on the user’s device, including IP -address, cookie information, information about the user's browser (or other program that accesses the Services), access time, address of the requested page.

1.1.3. "Processing of personal data" - any action (operation) or a set of actions (operations) performed using automation tools or without using such tools with personal data, including collection, recording, systematization, accumulation, storage, clarification (updating, changing), extraction, use, transfer (distribution, provision, access), depersonalization, blocking, deletion, destruction of personal data.

1.1.4. “Confidentiality of personal data” is a mandatory requirement for the Operator or other person who has access to personal data to prevent their distribution without the consent of the subject of personal data or other legal grounds.

2. GENERAL PROVISIONS

2.1. The use of the Site by the User means acceptance of this Privacy Policy and the terms of processing of the User's personal data. Voluntary registration of a user on the Site in order to gain access to the services of the Site means full consent in accordance with Article 9 federal law dated July 27, 2006 No. 152-FZ "On Personal Data" for automated, as well as without the use of automation, processing and use of their personal data, and also guarantees the accuracy of their personal data.

2.2. The User must stop using the Site in case of disagreement with the terms of the Privacy Policy.

2.3. The Site Administration does not control and is not responsible for third-party sites to which the User can follow the links available on the Site. On such sites, other personal information may be collected or requested from the User, and other actions may also be performed.

2.4. The accuracy of the personal data provided by the Site User is not verified by the Site Administration. The site administration proceeds from the fact that the User provides reliable and sufficient personal information required by the "site".

3. SUBJECT OF THE PRIVACY POLICY

3.1. This Privacy Policy regulates the obligations of the Site Administration to ensure the protection of the confidentiality of personal data and their non-disclosure.

3.2. Personal data authorized for processing under this Privacy Policy is provided by the User when filling out and sending feedback forms on the pages of the Site. Mandatory information when filling out forms is marked in a special way, other information is provided by the User at his discretion.

3.3. The site collects statistics about the IP addresses of its visitors. This information used to identify and solve technical problems.

3.4. Any personal information is subject to secure storage and non-distribution, except as provided in paragraphs. 5.2. and 5.3. of this Privacy Policy.

3.5. The site administration maintains the confidentiality of the User's personal information, except in cases of voluntary provision of information about himself for general access to an unlimited number of persons when using certain Services, including third-party ones (for example, Facebook, Twitter, Vkontakte, etc.), the user agrees to the fact that a certain part of his personal information becomes publicly available.

3.6. The User is aware that in case of authorization on the Site through accounts social networks, it is subject to the rules and conditions of the relevant social networks, including in terms of the processing and use of personal data and ensuring their confidentiality.

4. PURPOSE OF COLLECTING USER'S PERSONAL INFORMATION

5. METHODS AND TERMS OF PROCESSING PERSONAL INFORMATION

5.1. The processing of the User's personal data is carried out using automation tools or without using them in any legal way, no longer than required by the purposes of processing personal data, if the period for storing personal data is not established by federal law.

5.2. The User agrees that the Site Administration has the right to transfer personal data to third parties, in particular, to its counterparties, courier services, postal organizations, telecommunications operators, to provide services to the User.

5.3. The User's personal data may be transferred to authorized bodies state power Russian Federation only on the grounds and in the manner prescribed by the legislation of the Russian Federation.

5.4. In case of loss or disclosure of personal data, the Site Administration informs the User about the loss or disclosure of personal data.

5.5. The site administration takes the necessary organizational and technical measures to protect the User's personal information from unauthorized or accidental access, destruction, modification, blocking, copying, distribution, as well as from other illegal actions of third parties.

6. OBLIGATIONS OF THE PARTIES

6.1. The user is obliged:

6.1.1. Provide information about personal data necessary to use the Site.

6.1.2. Update, supplement the provided information about personal data in case of its change.

6.2. The site administration is obliged:

6.2.1. Use the information received only for the purposes specified in clause 4 of the Privacy Policy.

6.2.2. Take the necessary precautions to ensure the secure storage of personal information, without the prior written permission of the User not to disclose, sell, exchange, publish, etc. received personal data of the User, with the exception of paragraphs. 5.2. and 5.3. of this Privacy Policy.

6.2.3. Block/delete personal data relating to the relevant User from the moment the User or his legal representative or the authorized body for the protection of the rights of personal data subjects for the period of verification, in case of identification of inaccurate personal data or illegal actions.

7. ADDITIONAL TERMS

7.1. In case of loss or disclosure of Confidential Information, the Site Administration is not responsible if this confidential information:

7.1.1. Became public property before its loss or disclosure.

7.1.2. It was received from a third party until it was received by the Site Administration.

7.1.3. Was disclosed with the consent of the User.

7.2. The site administration has the right to make changes to this Privacy Policy without the consent of the User. The new Privacy Policy comes into force from the moment it is posted on the Site, unless otherwise provided new edition Privacy Policy.

An online calculator will help you quickly find out how many cubes of concrete you need and calculate the volume. Thanks to a quick calculation, you will know the number of cubes, you only need to set the data and thickness concrete slab and get the finished result. The calculator calculates concrete cubes for floor screed.

In order for construction work to proceed efficiently and without delay, it is necessary to provide the necessary amount of building material. When carrying out a floor screed, you need to know how much concrete is needed to complete this work.

How to calculate the number of cubes of concrete correctly in order to avoid unnecessary costs and availability poor quality material? Calculations can be made very simply using the online concrete cubic capacity calculator.

How to calculate the volume of concrete for laying the floor?

Using the concrete volume calculator, you can make the most accurate calculation in a few minutes. necessary materials for construction. To do this, you need to enter in the prepared table geometric the dimensions of the area of ​​\u200b\u200bthe room, using the formula we find out the area m 2 and enter this value. We measure the average thickness of the screed and enter this value in the table.

C is the height of the slab

In this way, the calculation of the cubic capacity of concrete with a calculator is performed in a matter of minutes, now you will find out how much concrete mix you need to purchase. Please note that the concrete thickness in the calculator table in meters is indicated by default!

Features of using a floor screed solution

So that the final result of calculating the volume of concrete for construction works on the floor screed has not changed radically, several factors must be taken into account in such work:

  • the area of ​​the room where the repair is planned;
  • the initial amount of the floor; the thickness of the concrete pouring layer will depend on such an indicator;
  • brand of cement and quality of sand.

How to calculate the required amount of concrete manually?

If you want to compare the data obtained with the calculation of the cubature of concrete with an online calculator, then for this you need to take the data on the area of ​​\u200b\u200bthe room for floor screed and multiply by the desired layer thickness.

Area formula

But in fact, not everything is so simple, a complicating circumstance in such a case will be the definition required thickness screeds, but for different type buildings will be different.

The features lie in the expected load on the floor, for example, in residential premises these figures are up to 5 cm, for the strength of the coating, and in non-residential premises - half as much.

Thus, if the area of ​​\u200b\u200bthe room is 20 m 2, then with a thickness of 5 cm, the final figures will be as follows: 20 m 2 * 0.05 m = 1 m 3, that's how much mixture is needed for floor screed.

What composition is best to take for floor screed

Before making a calculation of the amount of concrete for the screed, you need to decide which brand of mortar to choose. The best option there will be a solution marked M 150 or M 200, such a mixture can be obtained from M400 cement, if mixed with sand in a ratio of 1: 3, or to two parts.

  • room 29 m 2;
  • screed thickness - 5 cm;
  • required volume - 1m 3;
  • cement will be 0.24 m 3 (total 4 parts);
  • sand - 0.75 m 3.

Considering the weight of one cube of each component unit separately, we obtain the following data: if we take the average figures - 1300 kg for cement and 1625 for sand, then we get 325 and 1220 kg of each component, respectively.
When preparing materials, shrinkage of the solution must be taken into account, which often gives a result less than expected by 10%. It is necessary to make an appropriate reserve, so that later you do not separately make a new batch.

When calculating the volume of concrete with a calculator or manually, you need to carefully double-check the data, and only after making the final purchase of building materials. And in this situation, it's not even about money, but about the quality of the work done, how reliable and durable the floor will be.

If you use a calculator to calculate the floor screed, you must first decide which brand to make the screed, how to strengthen it, how economically you want to approach this matter.

To save concrete on half the floor, you can add a large fraction, for example, gravel or slag.

If we talk about the mass of the screed, then it can be done independently, we use the following proportion: we put two parts of sand and three parts of crushed stone, or screenings, on one part of cement. It is also possible to make the composition only from sand and cement, each master has his own methods, taking into account the characteristics of the initial state of the place for laying the floor. Calculate faster right amount sand and cement.

In order to strengthen the screed, a reinforcing mesh, fiber is used, such material is attached to the base, and the fiber interferes with the concrete for the screed.

What tools are used for the screed device

  • for a large amount of mixing, you will need a concrete mixer, and when using shovels, this process will be long and laborious;
  • beacons to ensure an even screed;
  • laser and conventional level, the more accurately the top point of the floor is determined, the better and more economically the work will be done;
  • and you will also need trowels, shovels, construction cars, buckets, etc.

When laying the cement mixture, the base must be dry and clean, and best of all with special penetrating compounds that will ensure good connecting function with laying mix.

There is a more economical and faster option. This method is very suitable for apartments and houses where it is required in as soon as possible make repairs.

Conclusion
Now you know how to calculate the cubic capacity of concrete with a calculator online or do it manually using simple mathematical calculations. Fast and high-quality repairs to you, be careful and follow the safety rules when working with cement mortar!