Any engineering structures, including gas supply pipes, have their own service life, after which they must be dismantled and replaced. If you are planning a home renovation, then it is worth remembering these parameters so that all cosmetic work can be done after servicing the home gas pipe.

IN this material Let's talk about how to make a sidebar in gas pipe to replace it, and what subtleties need to be taken into account in this process.

Specifications

Uninterrupted gas supplies to consumer homes directly depend on the throughput of gas pipes. In this regard, the calculation of this parameter is carried out especially carefully. Moreover, this process is mandatory regardless of the material of the products used - polymers or steel.

To determine the maximum throughput of each specific pipe, the following formula is used:

Q max = 196.386 T×(P/Z)×(D y /2),

where P is the value of constant operating pressure in the gas pipe, increased by 0.1 MPa; D y – size of the nominal diameter of the pipe; T – indicator of the temperature of the gas passing through the pipe in degrees Kelvin; Z – compression ratio.


Based on the formula, we can conclude that the higher the temperature of the gas transported through the pipes, the greater their temperature should be. throughput to prevent leaks, loss of seal or even explosions.

Although in professional activity masters often use more complex formulas for capacity calculations, the above calculation method is more than enough for independent selection of pipes of the required diameter.

However, to make your task easier, you can take ready-made data from a special table that shows the throughput of pipes depending on the gas pressure in the system.

Preparing to replace gas pipes

Thanks to its complex design The gas supply system performs two functions at once - gas transportation and storage. Depending on the main purpose, various systems may have their own characteristics. In particular, main gas pipelines, the main task of which is to supply energy to significant distances, are characterized by high pressure levels in the system.

Therefore, tapping into a gas pipe under pressure poses a great danger to an untrained person. Such actions can pose a danger not only to the employee himself, but also to the life, health and property of others. Consequently, illegal tapping into a gas pipe, without the involvement of specialists with the appropriate level of clearance and professional skills, is strictly prohibited.


If you do not know how to connect to a gas pipe, or there is a main line with high pressure, to replace communications in the house, you should contact special service, and under no circumstances do such work yourself.

At the same time, it is unlikely that your pipes will be replaced on the first visit of a gas worker. Typically, he first measures the length of individual components of the system, conducts a visual diagnosis of the condition of the pipes, and then within a few days makes construction estimate. In it he gives everything specifications required tubular products, describes the cost of materials and labor.

Standards for safe tapping into gas pipes

Before crashing into a gas pipe, you need to take care to comply with safety regulations at the site. There should be no open sources of fire near gas pipes, so the work site must be isolated from smokers and strangers in general.

In addition, at the approach to the point of connection into the gas pipeline, warning signs should be placed with the inscriptions “Caution, gas!”, “Passing is prohibited!”, “Smoking is prohibited!” and others with similar content. Such requirements are mandatory to comply with in order to avoid accidents.

When making connections into a gas pipe, you must also follow certain standards for working with them.


The most significant rules are:

  • when connecting to a gas pipeline with low pressure, it is necessary to ensure that its value does not rise above 80 mm Hg, but also does not fall below 20 mm Hg;
  • if work is planned in networks with high or medium pressure, then before starting the tie-in, this indicator must be lowered to an acceptable level;
  • gas cutting or welding of pipes can be carried out only on those sections of the pipeline where the pressure fluctuates between 40-150 MPa. Moreover, it is important to ensure that this indicator remains within acceptable limits throughout the entire period of work.

A standard has been established by law according to which only enterprises that have received a special permit or even an order to do so can tap into gas pipes without reducing the pressure level in them.

Please note that those cases where it is not possible to reduce blood pressure are rather exceptions, non-standard situations. Under such circumstances, to carry out repair work special equipment is required.

Types of insertion and preliminary actions

The preliminary preparation stage is mandatory in any case, whether you are a beginner or experienced master. If you yourself do not know how to cut into a gas pipe without welding or in any other way, contact an office that specializes in such work.

When contacting a contractor, when filling out an application for insertion, you may be asked to present a whole package of documents, statutory for such cases.

When making the initial connection to the gas main of a newly built house, the following documents will be required:

  • permission to tie into the gas main from an architectural planning institution;
  • topographical photograph of a specific area, certified by the gas industry. In addition to gas pipes, it must indicate all communications connected to the building: water supply and sewerage, heating;
  • technical passport or its copy, certified by a notary, a number of other documents.


But those owners who understand the intricacies of cutting into main gas pipelines, and are also quite confident that they can cope on their own, should only purchase necessary materials. However, be careful, as crashing into a gas pipe is illegal and not entirely safe. If the technology is violated, it can cause damage to the main line, which can result not only in harm to life and health, but also in administrative and criminal liability.

Connect the operating gas pipeline to new branch possible in two ways.

Cold tap

IN in this case the main pipe continues to operate normally without changes in the volume and pressure of the transported gas. This method is preferred for the initial connection of new subscribers.

Those who prefer to tap into a pipe under pressure themselves most often prefer this technology, since it is the easiest to perform.

Welding method


But the method of connecting gas pipes to the main lines can be reel or tee. With a coil connection, the ends of the pipes and the operating system are joined, and with the T-bar method, the axes of the pipelines are crossed.

Connecting the system to the gas pipeline

To tie into a common highway, it will be necessary to carry out the following measures:

  • Clean the connection area from debris, rust or paint.
  • Perform markings, mark the insertion location.
  • Make holes, of which there will be two - in the case of the T-bar method, and one - in the reel method.
  • Cover the cracks with clay. Processing should begin at the moment the surface begins to be cut. This will reduce the risk of gas fire. Immediately close the holes made with a plug made of clay and asbestos, and cool the surfaces after finishing the work.
  • Install the disconnecting device after the metal has completely cooled. To do this, pull out the plug and remove part of the cut pipe. After this, insert the disconnecting device into the resulting gap - it looks like little bags made of viscous clay and several rubber and wooden disks. If the T-bar method is used, there will be two slots.
  • Now you need to mount the pipe through which the gas pipe is connected to the main line. But first check that the diameters match. If nothing needs to be adjusted, then make a hole and mount the pipe, then weld the joints and close the valve installed on the pipe.
  • We close the holes and weld a new pipe. First, get rid of any remaining metal that was created during the process of creating the main gap. After this, connect the pipe to the pipe, treat it with clay and brew it. The quality of the weld is checked with a soap solution.

It is worth noting that welds and their types have strict designations and comply with GOST standards. In this regard, work must be carried out only taking into account all the requirements and standards that correspond to the characteristics of our gas pipeline.


If no leaks are found, then you can proceed to finishing work- that is, backfilling the trench. Despite the fact that the work may seem very simple, it must also be carried out in compliance with regulatory documents.

Typically, such documents contain the following information:

  • Soft soil no more than 20 cm thick is poured around the mortise unit, pipe and tap, followed by compaction.
  • At the very end of filling the soil into the trench, heavy equipment should not be allowed to collide with pipes, mortise units and ball valves.

Upon completion construction work You will need to sign an agreement with the local gas service to begin supplying blue fuel. In addition, the gas service will be required to provide technical and emergency dispatch services. The same organization will be responsible for accepting the finished gas pipeline system. After starting and setting up work, it is necessary to draw up a report and also seal the gas control system.


It is impossible to join a gas pipeline and a gas-consuming facility that is newly built and operating, as well as those that have not been accepted by a special commission, and is also prohibited. To connect such facilities, an act of acceptance for operation is required, in accordance with instructions approved by the head of the engineering department of the gas enterprise.

You can only join a gas pipeline system that is in operation when releasing gas into gas channels or objects. And at the end of the gas wire that is connected, it is necessary to install a barrier cap. If there is a special disconnect device at the end of the gas pipeline system, which means that the barrier cover must be installed after it. Gas supply channels to the premises are still preparatory stage, before the connection process, must be disconnected from the internal gas pipeline.

To commission a gas pipeline industrial production or agricultural or municipal enterprises must be notified of joining gas system enterprises to the city distribution source of the city gas service to launch the gas substance into the enterprise network. Also inform the district office of the city gas service by submitting a corresponding application from the enterprise.

Then, when the enterprise receives gas from the gas main, its gas pipeline must be connected to the gas main on the basis of an act on the acceptance of the gas system. Work on cutting into the gas main is carried out by a special gas service.

All gas pipeline structures and gas facilities, before connecting them, are subject to external inspection and pressure testing. Pressure testing is performed using air or inert gas. The process of crimping external gas pipelines of any pressure must be carried out under a pressure of 0.02 MPa. The pressure indicator may drop, but not more than 10 daPa per hour.

The control process of pressure testing of internal gas pipelines of industrial or agricultural enterprises, an enterprise that serves the population and has production tasks, instruments and devices of the gas pipeline system must be performed under a pressure of 0.01 MPa. But the pressure indicator can only drop by no more than 60 daPa per hour.

Under a pressure of 500 daPa per hour, the internal gas pipeline system and equipment of the enterprise, which serves the population and has non-production tasks, are pressurized, residential buildings And public buildings. The pressure indicator when falling is no more than 20 daPa for five minutes.

The tank with liquefied gas and the gas pipeline system of the group cylinder installation are tested by a control process at a pressure of 0.3 MPa in an hourly period of time.

As a result, the tests can be considered positively completed, provided that there are no moments when the pressure drops or leaks. This is determined using a pressure gauge and a soap emulsion.


The results obtained are formalized in a report and written down in the order for performing dangerous tasks. gas works. The air pressure indicators in the gas pipeline system that is connected must be maintained until initial stage connection process and gas start-up.

In the case when gas pipelines that have passed the inspection and those that have been tested with control pressure indicators are not filled with gas, then in the conditions of restoration of gas startup work, they must undergo inspection and pressure testing again.

Gas penetration and welding work on gas pipeline structures that operate in normal mode, in the case of connecting other gas systems to them, must be carried out under gas pressure within 40-150 daPa. These indicators are checked throughout the entire time period while the work is being carried out. In the event that the pressure begins to fall below 40 or rise above 150, cutting and welding work must be stopped. You need to monitor the pressure in the required area using an installed pressure gauge.

The moment the pressure indicators in the gas pipeline system decrease under the conditions of cutting in occurs with a special shut-off device or indicator regulator. If special devices are used that ensure complete safety and execution of processes at a high-quality level, it is allowed to connect without reducing the pressure indicators. The method by which the gas pipeline will be connected to the one that is already in operation is established by the enterprise.

The procedure for cutting into gas wires using gas is carried out according to the instructions developed by gas industry enterprises. The presence of persons outside the process, smoking and open fire in the cutting-in work area is prohibited.


Various holes on the ground during cutting work must be fenced off near the work site by posting warning signs: It is forbidden to pass!, It is forbidden to smoke! and Attention! Gas! Be careful!

It is also prohibited to introduce gas into a gas system unless it has been verified for integrity through inspection and testing procedures, in addition to ensuring that the gas fittings are in good working order and that the required barrier caps are in place. Gas is introduced into special equipment for residential premises before the residents of the house have moved into it.

When starting gas, gas pipeline structures must be purged until all the air is displaced. The completion of the blowdown can be determined by analysis or by burning the samples that are taken. In this case, oxygen should not be contained in the gas in more than 1%, and a test sample of the gas should burn without emissions and in a fairly measured manner.

When blowing out a gas pipeline, it is prohibited to spray a mixture of gas and air in the building, on staircases, in chimneys and in the ventilation system. The building where gas consuming appliances, gas pipelines, and gas equipment are located must be regularly ventilated when starting the gas substance.

In case of blowing through the gas pipeline, the mixture of gas and air should be released in an area that eliminates the risk of it passing into the room, in addition, where the formation of a flame from any fiery source is excluded.


When starting up a gas resource for the first time, you need to carefully ensure that it is supplied with pressure indicators that do not exceed those for which the gas pipeline system was designed. At the time of launch and immediately after this, it is necessary to vigilantly monitor the entire gas supply system, in the case of laying underground behind all objects, including a basement, well, buildings, which are located in an area within a radius of 15 meters from the gas source of the gas pipeline. Increased monitoring is necessary in winter and spring, when frozen soil mass above the gas pipeline structure can make it difficult for gas to escape from underground. Do not forget that when gas flows from a gas channel underground, it moves through the soil mass at a speed of up to 7 meters per hour.

Work processes related to connecting a new gas pipeline to an already fully operational one must be carried out by specially trained people under the supervision of specialists in the gas industry.

Work on connecting to the gas network is considered gas hazardous and is carried out according to a scheme that has been approved in advance. Orders are made for such work. In the preparatory stage of the work process, a drawing of the connecting nodes is necessarily carried out, a method for connecting work is determined, the procedure for reducing pressure in the gas pipeline is calculated, of course, where it is required, and they are ensured in a stable condition for the entire period of connection. Also calculated necessary materials, protective equipment, rescue equipment, first aid medical care. In addition, barrier caps and valves on the gas line that is connected must be closed.

Connection methods

So, several ways are used to connect a new gas pipeline to an existing one, such as:

1. Connect using gas (low pressure readings within 40150);

2. Connect under high and medium pressure without reducing it, using special devices;

3. Connect the pipes, disconnecting them and freeing them from gas.

When performing work, there is an option to turn off the gas locally using a wooden disk, a piece of burlap, a clay mass, or a rubber chamber.

Connecting a new gas pipeline in a way when you need to disconnect the existing one, using a rubber chamber, is acceptable for a gas pipeline that has a diameter of up to 60 cm. The pressure indicator must be reduced to 150. First, you need to check the hand pump for serviceability and the sealing properties of the chamber. It is necessary to install a certain type of pressure gauge and monitor the pressure.

The procedure is as follows:

1. Using an autogen, a hole is cut in the gas line that is operating. The hole diameter is about 10 cm.

3. A chamber must be inserted into the channel through the hole and filled with air mass, ensuring strong contact with the walls of the channel.

4. The area that is disconnected is blown through the hole.

5. Then, it is necessary to cut into a new gas pipeline that has a barrier cover.

6. Finally, the chamber should be removed from the working wire, the hole should be welded, pressure restored, and the tightness properties of the connecting section checked.


Attach using a visor

1. The area where the connection will be made is cleared of insulating residues.

2. Mark with chalk and cut the end of the pipe together with the steel barrier cap. Then the canopy is cut into the extension to a size that ensures unimpeded removal of the disc that is being cut out (the wall).

3. On the gas pipeline, it is necessary to mark in small pieces the diameter size and its circumference, which is equal to the diameter of the product that is connected. Weld a rod in the center, the diameter of which is about 8 mm, and its length is about 20 cm. This is necessary in order to remove the piece of pipe that is being cut out.

4. Cut a disc along the intended circle, leaving a small piece of about 5 mm so that the disc is held. You need to cut downwards.

5. Extinguish the gas, cover the hole with a clay mixture along the trajectory of movement cutting tool. If the putty dries out, then coat it again with the already diluted clay mass.

6. The flame is extinguished, the cutting area is cooled.

8. You need to insert a wooden disk with a seal into the extension through the hole. Fit the canopy to the extension and to the gas pipeline structure.

9. Extract wooden product, having knocked out the rugged surface of the wall with a hammer, remove it using a rod and press the visor tightly with asbestos applied. Leaks must be prevented by using asbestos.

10. Secure the visor with wire, the diameter of which is about 3 mm.

11. Blow the connection area thoroughly, removing all the mixture.

12. Weld the visor after cleaning it first.

13. Fit the pipes, install a steel gasket on top of the canopy and weld with an overlap. The gasket is 20 cm larger.

14. Before installation, the gasket is heated gas appliance, make a bend with a sledgehammer and fit it over the products so that it overlaps them.

15. Tap the connecting areas, clean them and check them under operating pressure using a soap emulsion. The area where the attachment occurred is cleaned and covered.

16. Install the control tube and fill the ditch.


End connection

1. Having cleaned the gas pipe, mark with chalk and cut out the visor, keeping a gap of about 50 cm from the steel barrier cap. The size of the visor should not interfere with the installation of the disk. Cut out the disc and cover the gap with a clay mixture. Cool the cutting area.

2. Separate the visor and install a disk inside the gas pipe that is in operation, which, in turn, is secured with a wedge and coated with clay mass. If the diameter of the product is less than 15 cm, then you need to put a plug in the pipe using bags and clay. Remove the chamfer and fit it to the pipe.

3. Mark and trim the ends of both structures and barrier covers. Remove chamfers.

4. Mark and cut connecting node. The length of the assembly can be determined by breaking both gas pipelines, taking into account allowances for adjustment. Install the assembly, grab it and weld it at the connecting points.

5. After cooling the disk, remove it and apply a visor using sheet asbestos. Secure it with steel wire, the diameter of which is about 3 mm. Blow gas through the area to be connected.

6. Weld the visor, clearing the chamfer from dirt. Fit, install and weld the steel gasket.

7. It is allowed to use paste to seal cracks.

Connection using a slide-on product

1. Clean the connecting areas from insulating residues.

2. Prepare a pipe for connection (slide-on) with a diameter that is approximately 2 cm larger than the outer diameter of the gas pipeline that is being connected.

3. Prepare an external extension about 15 cm long, the diameter of which is 1.5 cm greater than the external parameter of the connection pipe. Install the extension, align it and attach it to the existing wire. The axes must coincide. Having adjusted the extension, weld it.

4. Cut off the barrier cap at the end of the gas line and slide the pipe on. Weld special ones to the ends of the pipes, the diametral parameter of which is 3 mm less than the outer parameter of the pipes and expansion.

5. Cut out the wall through the extension, leaving a jumper of about 4 mm. Remove the wall using a pre-welded rod.

6. Extinguish the gas using clay.

7. Pull the pipe. At one end it rests against the wall of the gas pipeline network, which is active, and at the other it moves at least 10 cm onto the product.

8. Use a hammer to cut the window and remove it, pushing it all the way into the gas system. Seal the gap between the walls with asbestos cord until the gas stops escaping.

9. Blow with gas until the mixtures disappear completely. Heat the ends of the products with a burner and roll them, then overlap weld them.

Then all procedures are performed in the same ways. The walls are removed and the gaps are sealed with an asbestos cord in a gas mask.


how to crash into a gas pipe at home

Connection using a coupling is performed in the following order:

1. Clean the connection area. Prepare the coupling outside diameter which should be 2.5 cm larger than the external parameter of the connection pipes. The length of the product can be determined by the gap between the ends of the products and add 20 cm. The coupling is installed on the ends of the connection pipes.

2. Cut off the ends of the products together with the barrier caps. Extinguish the gas with a clay mixture. Weld the rings onto the ends. At the end of the pipe and weld both parts.

3. Check the coupling by sliding it onto the end of the second pipe. Separate the cut ends and barrier caps, then slide the coupling onto the second pipe. Both ends must be overlapped by a coupling by at least 10 cm.

4. Reinforce the gaps between the walls of the products with asbestos cord. It is necessary to compact until the gas stops escaping. After blowing through the pipes, heat the sides of the coupling with a gas appliance and press them with a hammer until they are completely connected to the pipes. Weld the ends of the coupling.

It can be connected via a bypass for the duration of the installation process regarding the shut-off equipment to the existing gas channel. In addition, in conditions of switching existing inputs of continuous gas flow. The diametric parameter of the bypass product is equal to a fifth of the diameter of the products that are connected.

The process is performed in this order :

1. Make a bypass product, the length of which is equal to the length of the section that is planned to be turned off and add 2 meters to it. Prepare two extensions 5 cm long; their internal diameter should be 1.5 cm larger than the external diametrical parameter of the bypass product.

2. Keeping a gap of one meter from the boundary of the area that is being switched off, mark a circle of diameter equal to the internal indicator on top of the pipe with chalk. Weld a rod 0.8 cm long and 20 cm long in the center of the circle. Weld extensions to it. Check the installation of the bypass in the extensions.

3. Inside the extensions, cut out disks in the walls according to the marks, leaving a 3 mm section. Extinguish the gas with a clay mixture.

4. Knock out the discs and remove them using a rod. Install a bypass from inside the extensions. Seal the joints with cord. Grab it to the expansion using welding equipment at 3 points.

5. On the marking sections of the pipes, cut a pair of canopies at a gap of 10 cm from the bypass product. Once cooled, separate them. Install a barrier cover through the hole from the inside.

6. After completing the work, remove the barriers, weld the visors, and place the disk on the hole.

7. Test the suture areas and isolate the work area.

Preparatory work for the pits and reception, insulating measures in the cutting areas and work on backfilling the pits are carried out by the company that built and connected the gas system. Before connection, electrochemical means must be turned off. Connection work under the influence of gas from inside the room is prohibited.

After all the work carried out, the tightness of the seams is checked special device or emulsion when using pressure. It is also worth going around the gas main, marking the work performed in the work order, and recording everything in the passport. Attach the work order and diagram to the rest of the documents and keep them together.

To open the flange at the connection, devices are used, for example, a copper wedge. It is suitable for products with a small diameter.

If the diameter is more than 30 cm and it is necessary to open the flange, then fasteners are welded for mounting a jack between them. Can not use hydraulic jack. It is necessary to install wooden spacers to prevent it from falling. It would be better to secure it to the gas pipeline. During the installation of barrier covers, it is necessary to check the dimensions of the covers and whether they correspond to each other, you need to prepare gaskets and lubricate the bolts.

Gas has a responsible mission - to ensure that we do not freeze and starve. Meanwhile, he himself does not come to visit, for example, like the wind or the sun, gas must be properly “invited”, a green corridor must be organized for him and reliable “transport” must be provided. Let's look at how to crash into a gas pipe according to the letter of the law and like a hooligan - for those who like to tickle their nerves by breaking the rules.

Types of gas pipelines

A gas pipeline is a means of transporting and at the same time storing gas. These designs may vary depending on what mission they are performing. For example, networks that ensure the transmission of blue fuel over long distances are naturally more powerful and the pressure in them is high. Because of this, “experimenting” with such systems is dangerous, you can provoke trouble, and not only affect you, but also your neighbors. Let the relevant services that arrived at your request worry about how to make an insertion into a gas pipe of this format. Pipes extend from long-distance workers, like vessels in circulatory system human, small - called distribution pipes, in which the pressure is lower than in the main networks. But it can also vary - from low to high. You can already try to “make friends” with such structures on your own, however, you need to clearly know what and how to do, and also follow safety measures.

It is, of course, better to entrust the connection to the highway to professionals

Features of the sidebar

What is a sidebar? In professional terms, this is the connection of a new pipe to a working “relative” - already transporting blue fuel. Often systems are connected without turning off the gas, even main ones, but in this process there are important nuances. So, let's look at how to cut into a gas pipe under pressure.

Work rules

Remember the basic rules for handling these systems:

  • It is permissible to insert into a network with low pressure at pressure levels not exceeding 80 mm water column, but not lower than 20;
  • connection to highways or networks with high/medium pressure is possible only after its level has been reduced to an acceptable level;
  • if it is impossible to reduce the pressure, you will have to find special equipment that allows you to make insertions under unusual circumstances;
  • According to the law, work without reducing pressure is allowed to be carried out only by appropriate organizations that have permission for this type of activity (sometimes even receiving a special order);
  • welding and gas cutting can be carried out in areas with pressure from 40 to 150 kg/cm (and this corridor must be observed throughout the entire process).

Craftsmen working with the gas network must have a special permit. Before starting the process, make sure the contractor has such a document

Types of inset

You can connect a new network to a working system using the following technologies:

  1. Cold tapping, in which the main pipeline operates without changes (the volume of blue fuel in the structures and the supply pressure remain the same - working). According to this “scenario”, gas networks of new users are often connected to the main line. Many craftsmen know how to cut into a gas pipe without welding, since this technology is relatively simple.
  2. Welding, popularly called the “traditional method,” is a reliable, time-tested technique, although it requires certain qualifications and special access for those involved in the connection.

As for the insertion methods themselves, they are divided into:

  • reel, implying connection to the end of a working system;
  • T-bars, when the insertion is made with the intersection of the axes of the networks.

Video: connecting to the gas system with your own hands

Process description

Connection of metal systems

  1. Surface cleaning. Remove paint, debris, and rust from the place where you plan to make the insert.
  2. Marking. Determine where the connection will be and mark it.
  3. Making holes (with the coil method - 1, with the T-bar method - 2).
  4. Well treatment. The cracks should be treated with clay, and it is recommended to begin this process while cutting the surface in order to minimize the risk of burning/ignition of leaked blue fuel. The finished holes must be closed as quickly as possible with a special plug (made of asbestos and clay). The treated area must be cooled.
  5. Installation of disconnecting device. When the metal has cooled, the plug can be opened to remove a fragment of the cut pipe from the structure. After removing the piece of metal, a disconnecting device is placed in the gap, which is a set of disks made of wood and rubber, as well as a bag of viscous clay. If you adhere to the T-bar method, then there will be two such slots.
  6. Installation of the pipe. When the disconnecting device has covered the gap, it’s time to start making the main hole - for the attached (new pipe). Check that the diameter is correct; it is possible that the markings will have to be corrected. Make a hole and install a pipe. Weld the joints of the pipe on both sides, then close the valve on it.
  7. Sealing the hole. So, the pipe is welded, now we need to weld a new pipe. To do this, first remove the remaining metal that appeared as a result of making the main gap. Insert them into place, treat them with clay, and brew them too. Check if the weld seam is leaking gas (using soap).
  8. Connecting a new pipe.

After installation metal constructions It is advisable to paint them to protect them from corrosion

Insertion into a plastic pipe

Increasingly for installation utility networks use plastic structures. If you need to connect to such a system, what should you do? First, be glad that the process will not be more complicated than with metal. Secondly, strictly adhere to such recommendations.

Buy high-quality - factory-made connecting elements (fittings) that comply with GOST, ideally metal. Use a socket joint and special glue to improve the reliability of the seam. Make sure that the joint is perfectly sealed and has maximum density. Before installation, treat the insert with an anti-corrosion compound.

How is the insertion itself carried out in the case of plastic nets? The connection is made by creating inserts located perpendicular to the operating system. The length of the inserts can vary between 70-100 cm. Extension should be done using plastic pipes- based on a socket-contact connection. What is this technology? The steel insert is heated (to approximately 60 degrees). And they’re already impaling her plastic construction, and instantly and with force. If you are cutting into a system with medium pressure, experts advise connecting powdered polyethylene to the “case” in order to make the connection as strong as possible.

This is how you connect to the plastic network

It is, of course, better to cut into a gas pipe with the help of professionals, however, having mastered the theory, you can experiment, meanwhile, it’s up to you to decide.

Video: inserting into a gas system using special equipment

Replacing gas pipes in an apartment, like any other pipelines, is required after many years of use. Therefore, if you plan to make repairs, pay attention to the service life of gas pipes, since leaks may occur in old pipes and, changing them, the repair will have to be redone at least partially.

Cutting old pipes is done with a grinder, and the products of such work will certainly not go unnoticed on the walls and other interior elements.

Replacing a gas pipeline in an apartment

As you know, replacing gas pipes with your own hands is prohibited, so only specialists from gas service companies are allowed to do this type of work.

Therefore, if a replacement is necessary, you will need to contact the appropriate institution and wait for the technician to arrive.

Most likely, the first visit of a gas service employee will not replace your pipe, since the technician will need to inspect the gas system, measure the length of the gas pipes, draw up an estimate for the work, as well as the cost of new pipes for the household gas pipeline.

Gas pipe replacement work

Having arrived at the installation site, the technician must remove unauthorized persons from the site and ensure that there are no smokers or sources of open fire.

Before entering the work site, a warning sign “Caution! Gas!”, “Smoking is prohibited!”, “No entry!” etc.

Before cutting a gas pipe and starting work on installing a new one, the gas worker must block the access of gas to the gas pipeline to which the new pipe will be welded and remove (blow out) the remaining gas from it. Blow gas into the room ( ventilation ducts etc.) is strictly prohibited.

Once all safety precautions have been taken, the gas pipe can be trimmed. As already mentioned, it is usually produced using an ordinary grinder. Next to the place old pipe a new one is welded.

Checking the integrity of the household gas pipeline and rules for starting gas

The release of gas into the pipe is prohibited until its integrity, the presence of all required plugs and the serviceability of the connected pipe are confirmed by inspection and appropriate tests (soap emulsion). gas equipment.

When starting gas, the gas pipeline must be purged until all air is displaced from it. The duration of purging is determined by analyzing the gas samples taken.

The oxygen content in the gas should not be more than 1%, the combustion of the last sample should proceed smoothly, without popping. When blowing the gas pipeline, after the gas pipe has been replaced, it is prohibited to release the gas-air mixture into the room, the ventilation outlet, staircase and so on. When starting gas, the room in which installation work is carried out must be provided with constant ventilation.

During and after the release of gas into a newly connected outlet of the gas pipeline system, it is necessary to ensure enhanced monitoring of the operation of the gas system.

Tapping into a gas pipeline

Apartment buildings are often equipped with a gas pipeline system even before residents move in. But what if you need to tap into the gas pipe of a newly built house? Let us describe what the gasification procedure at home looks like.

Preparation of necessary documents

The list of documents required to connect gas to the house is as follows:

  • those. passport for home or a certified copy;
  • a photograph of a topographic survey of the site on a scale of 1:500, certified by the gas service, with a gas pipeline and other communications marked on it (,);
  • permission to connect an architectural and planning institution to the gas pipeline;

  • documents for equipment planned for installation in a house to which gas will be connected - a certificate of conformity, a contract for servicing the equipment, a conclusion that it is subject to use in house construction;
  • inspection report (VDPO), received after contacting Gorgaz.

How to obtain permission to tap into a gas pipeline

In Gorgaz you will need to find out which design organization for gasification of the house they recommend, since this will be the key to the absence of problems in the future. You will need to agree with the design engineer on the placement project and brand of gas equipment and heating devices, after which the specialist will independently have to approve the project in the technical department of Gorgaz.

Read the contract carefully. You should be interested in items with clearly stated guarantees on the part of the contractor.

Installation of a domestic gas system and connection to the gas pipeline

After installing the gas pipeline and equipment, the design organization draws up a package of as-built technical documentation. The work is accepted by a special commission consisting of a representative of Gorgaz, the contractor and the customer.

You will also need to pay for the technical inspection receipt and provide a copy of it to the installation company. In the near future, representatives of Gorgaz will seal the meter, and an agreement will be concluded with the customer for the supply of gas and maintenance of the part of the gas system belonging to it.

Don't know how to crash into a gas pipe? To do this, you will need to hire a special service that carries out tie-ins.

Having connected you to the gas pipeline, specialists will open gas tap and will perform a test run of gas, thereby checking the entire system for leaks.

Having made sure that everything is in order, all you have to do is carry out commissioning of the equipment, which, however, can also be carried out by the selling organization, of course, if you have an appropriate agreement for technical and warranty service.