Stairs.  Entry group.  Materials.  Doors.  Locks.  Design

Stairs. Entry group. Materials. Doors. Locks. Design

» Repairing the bathroom floor in Khrushchev. What should be the design of a bathroom in Khrushchev. Free visit of a measurer

Repairing the bathroom floor in Khrushchev. What should be the design of a bathroom in Khrushchev. Free visit of a measurer

Repair is generally not an easy undertaking. In the case of small-sized housing, everything is complicated by the small size, and in old houses there is also the problem of worn-out utility networks. Replacing them is also a concern for the owners, since the wait for the management company to change them can be long. So the renovation of a bathroom in a Khrushchev-era building usually begins with the replacement of old risers.

A distinctive feature of Khrushchev apartments is the small size of all rooms. The bathroom and toilet are so small that even the minimum set - bath + sink - becomes only compact. Finding a place to install household appliances is a difficult task. The most popular solution is, which almost always affects the bath and toilet. Two microscopic rooms are made into one - a combined bathroom. Due to the fact that the partition is removed, the area increases by almost a square meter, which in these conditions is very significant. In some options, it is possible to increase the space due to the corridor or a nearby storage room. This renovation of a bathroom in a Khrushchev-era building is technically more difficult and it is more difficult to obtain permission for such a remodel, but anything is possible.

The procedure for renovating a bathroom in Khrushchev

If you decide to make a major renovation of a bathroom in a Khrushchev-era building, the procedure for work will be almost identical, with or without redevelopment. When remodeling, the destruction of the partition, the removal of the door, and the blocking of an unnecessary doorway are added. Further everything is like a carbon copy.

  • delete everything Decoration Materials. If the walls and ceiling are crooked (differences of more than 3 cm) or there are voids under the plaster (the sound is dull when tapped, movement is felt when pressed), the plaster is also beaten.
  • Decide what kind of plumbing and Appliances where it will stand, draw a plan according to scale. Draw electricity, water, and sewage connections on the plan.
  • Show me to the bathroom.
  • Replace water supply and sewerage risers (coordination with the management organization is required). Most often old metal pipes exchanged for plastic ones. When replacing the water supply, use or.
  • If the water supply and sewerage are hidden, they should be made to have a small depth under them, since there will still be plaster on top. If not, plumbing and sewer pipes done after finishing the walls.
  • Fill the floor leveling screed. You can “roll up” in it (a water bottle in high-rise buildings is allowed only if there is individual heating, and only if the floors can withstand the load).
  • Wall and ceiling decoration. Here the sequence of work is different - it depends on the chosen method of finishing and plumbing. If, installation occurs at this stage. At the same time they do. When installing standard plumbing, it is installed after finishing work is completed, so first the half-wall and ceiling are put in order.
  • Plumbing and household appliances are installed.

There are more and more options for finishing materials. For example, you can lay or on the floor in the bathroom. In this case, a layer of self-leveling mixtures is needed on top of the screed to obtain a durable and level base, and the coating itself is laid last after all work is completed, but before installing the plumbing. In general, the procedure for renovating a Khrushchev-era bathroom can vary significantly.

Increasing functionality

Renovating a bathroom in a Khrushchev building is difficult not so much from the technical side, but from the point of view of creating a beautiful, functional and comfortable room. The small size of the room is the main difficulty. We have to look non-standard solutions when selecting equipment, plumbing and furniture.

Bath or shower

When renovating a bathroom in a Khrushchev-era building, they often abandon the bathtub in favor of a shower stall. This allows you to find space in a small room to install a washing machine. Most good decision- corner shower. In this case, a fairly decent piece of space is freed up, in which you can put a washbasin or washing machine.

One option is to install a shower stall with a deep tray or simply install glass doors on the bathroom

If you still want to lie in the bathtub from time to time, you can compromise with a deep tray. But it is worth remembering that high sides are not very convenient for daily use if there are small children or elderly people. Why are they worse than a regular bathroom? The fact is that you won’t be able to fully lean on them - they are plastic, and they won’t withstand heavy loads.

To make a bathroom in a Khrushchev building more comfortable - the sink can be installed above washing machine

Until you get used to it, it is not very convenient to use the sink - it is installed a little higher than usual, but it is much more convenient than if you install a small one to save space. This, by the way, is also a way out, but not the best.

Design and design tricks

To make the renovation of a bathroom in Khrushchev not only functional, but also beautiful, we select the right finishing materials, their color and texture.

Using every centimeter is the task

Finishing materials and their color

Bathtubs in Khrushchev-era bathrooms are not only small, but their ceilings are low. Because suspension systems if you install it, then only on minimum distance, and this can be achieved by setting Wall lights or built-in ceiling ones, but with LEDs, which are about 3-5 cm thick. This loss will be almost imperceptible, and the work will be significantly less than with subsequent puttying.

It is not necessary to lay tiles on the walls. IN in this case smaller mosaics look even better, since large tiles“reduces” the room. More options for wall decoration in a small bathroom - painting and finishing decorative plaster. Bathroom paints create an equally reliable coating, but this option costs less money, especially if you putty the walls before painting yourself. It is also moisture resistant, and this type of finish looks modern.

In any case, the ceiling and walls in a small bathroom should be made in light colors, preferably with a slight gloss or pearlescent, silky sheen. This finishing option makes the room visually more spacious. Most often these are shades of beige. A very unobtrusive and democratic color that can be enlivened by some details of brighter colors.

Another technique is that the walls are monochromatic and only approximately in the middle there is a wide stripe of a brighter or contrasting color. This technique “pushes” the walls, the room seems larger than it actually is.

Selection of plumbing

If, when renovating a bathroom in a Khrushchev-era building, you decide to replace the bathtub with a shower cabin, refuse to install a ready-made cabin. Even the smallest one takes up a lot of space, and plastic walls take up a lot of space. You literally physically feel the lack of space. Make a pallet from tiles and place glass partitions- more practical solution. The doors can be made sliding - there are a sufficient number of systems that are easy to install with your own hands, and for craftsmen this is not a problem at all.

Colors are light, vertical stripes breaks the monotony, but the highlight of the interior is the bathroom and sink non-standard shape. They complement each other perfectly and both are convenient to use.

When choosing a sink, try to find the option that best fits into your interior. They come in different shapes, sizes, colors. There are wide and narrow, deep and shallow, corner ones - in the form of a sector, such that are partially located above the bathtub. In general, there are many options. Yes, they cost more than standard solution, but if possible, choose beautiful and comfortable plumbing fixtures.

DIY bathroom renovation in Khrushchev: photo report

Apartments in Khrushchev-era buildings are usually inherited or bought by young families. Their condition is usually deplorable; if repairs were made, they were done about 20 years ago. So in this apartment the bathroom doesn’t look very good.

Raw material

This bathroom renovation in Khrushchev is traditional - tiles on the floor and walls, the ceiling is made of PVC panels. It all starts with the removal of all finishing materials.

The next stage is leveling the walls with plaster (without beacons, since the walls are relatively smooth). The floor is covered with a screed made of...

An ideal surface is not needed - tiles will be laid

After the screed has set, laying the tiles on the floor begins. We lay it out diagonally. To make it easier, first draw a plan on the floor (in pencil).

After installation floor tiles We started supplying water and sewerage, installed a bathtub and connected it.

After that, they began laying tiles on the walls. This is not always the case. The second finishing option is to first tile the wall, then install a bathtub, and seal the gap between the wall and the side. The second option is preferable, since at any time you can replace the bathtub or install a shower stall. In the first case, everything will have to be redone.

After the walls were finished, we assembled the frame for suspended ceiling from plastic panels. Economy option, but later you can change it to any more expensive one.

After that, only the little things remained - hanging the mirror, installing and connecting the sink with a built-in cabinet.

And the finishing touches are a rod near the bathtub, a shelf and hooks.

The bathroom in apartments built in Khrushchev’s times is not large in size or has a high level of comfort. But if desired, these shortcomings can be eliminated with your own hands. This article is all about successful bathroom renovations in Khrushchev, photos and designer tips.

The bathroom in Khrushchev-era buildings in most cases looks like a combined bathroom of small size and rectangular shape. It is also possible to have a partition between the bathtub and toilet. Standard bathrooms are inconvenient, but with a skillful approach, this disadvantage can be eliminated, giving the space coziness, comfort and an attractive appearance. Below are photos with successful layout options for a small bathroom in Khrushchev high-rise buildings.

If you abandon bathtubs in favor of shower complexes, after renovation, a small bathroom will have space for a washing machine. It is also worth putting a window between the bathroom and the kitchen.

Possible options for expanding the space:

  • remodeling the space by dismantling the partition between the bathroom and toilet will allow you to expand the space to 7 sq m (2.2 m by 3.2 m = 7 sq m);
  • renovation of a bathroom in Khrushchev by dismantling the wall and connecting it to the corridor space, which makes it possible not to dismantle the partition between the toilet. But if you take this step, you will get a fairly spacious bathroom of decent size. With such a redevelopment, it will be necessary to organize the entrance to the kitchen through the room, and seal the entrance to the corridor;
  • connecting the bathroom with the kitchen space by dismantling the wall where there is a window is also possible, but this interior is relevant if you first dismantle the walls between the kitchen and the room, seal or move some openings. Then you will get a studio apartment with expanded bathroom space. Most importantly, do not plan to dismantle load-bearing wall. Doing this is strictly prohibited.

Before you start renovation work with your own hands, you need to prepare a bathroom plan in a Khrushchev-era building, which will indicate all the sizes of furniture and appliances, as well as the future layout of their location. Such a plan, on which all the ideas are written, will become the basis for calculating the exact amount of current materials and creating a preliminary estimate.

Color selection

As a rule, finishing materials for the bathroom are purchased in blue-green tones, as well as all shades Brown. These are standard shades, calm and harmonious. They allow you to tune in to rest and relaxation, restore body muscle tone, and lift your mood during bath procedures. Such a bathroom interior is always beneficial, because it is a classic of the genre.

But today manufacturers create many interesting non-standard color options that are actively used by modern decor:

  • bright red and orange tones. Many young people today prefer a bright and dynamic interior. They are not afraid of the risk of quickly getting tired of such flashy colors. This is correct, because life should be filled with bright emotions, fresh notes, and dynamic colors. Bathroom renovation in Khrushchev, as in the photo, definitely cannot be called boring, outdated or standard;
  • delicate pink, cold purple and juicy crimson colors are becoming more and more common today in a bathroom of 5, 6 sq. m. These are options for romantic people who want to achieve unity with their own self. This interior is shown in the photo below;
  • The laconic black and white combination of tiles in the bathroom is very fashionable today. This is a calm and at the same time catchy interior, which can be the basis for interesting solutions in the bathroom. This bathroom renovation in Khrushchev is shown in the photo. Designers with extensive experience recommend this type of finishing to those individuals who often like to change the appearance of their home. It is not at all necessary to change the design of the wall often, just change the accessories, the room will sparkle with new colors, and the finish will remain the same.

Finishing materials

Today, manufacturers of finishing materials delight customers with a huge selection of products. What ideas can you use to make the decor of a 7 sq. m bathroom as attractive as possible? Let's consider possible technologies.

Floor

To begin with, we note that you need to move on to finishing the bathroom floor in Khrushchev-era buildings only after installing all communication systems. You will also need to level the base and seal all holes and cracks. Next, you can proceed to laying the finishing material. When choosing a material for the floor, you need to pay attention to its anti-slip properties and resistance to moisture.

Here are a few options that are relevant for this case:

  • natural stone is very beautiful, resistant to the aggressive environment of bathrooms and durable, but its price is prohibitive for many owners of bathtubs in Khrushchev-era apartments;
  • agglomerate is a new finishing material with properties similar to tiles. Its peculiarity is the ability to take curved shapes under the influence of a special heating tool. But today agglomerate is rarely used for finishing walls and bathtub floors in Khrushchev-era buildings of 6 sq m due to its high cost;
  • ceramic tile It is the most a good option for bathroom floors in Khrushchev houses. It is durable and practical material, the decor of which today is very diverse.

Walls

After all communications in the bathroom have been replaced, you can move on to decorating the walls. Allows you to bring comfort and coziness correct finishing using the following materials:

  • bathroom design in Khrushchev using paints and varnishes is extremely rare to find today. Such technologies have fallen into oblivion due to impracticality;
  • the ceiling and walls can be decorated with PVC panels, as in the photo. PVC boards are very popular today, as they have a number of advantages: they are practical, resistant to wear, and are somewhat cheaper than ceramic tiles. Plus the finish looks pvc panels, as in the photo, very advantageous;
  • ceramic tile. Today you can purchase wall tiles in standard and unique sizes. If you don’t want to overpay for originality, you can prefer the 30*30, 30*40, 30*60 models familiar to domestic buyers. However, when choosing this finishing material for bathroom walls of 5, 6 or 7 square meters, you should choose smaller tiles. Note that larger tiles are thicker and are attached with a larger amount of glue. In a tiny room this is unacceptable, since a thick layer of decoration on the walls will somewhat reduce the free space of the room.

Ceiling

If the bathroom in Khrushchev is combined, then its ceiling can be decorated using different technologies. The main rule is that the finishing material must be resistant to negative impact moisture and steam.

Ceiling designs may vary:

  • the stretch ceiling is made for a short time and allows you to organize spot light. And if you use a highly reflective glossy film, you will create the effect of visually expanding the space. The photo below shows the interior of a bathtub with this design. But for such construction it will be necessary to build a frame that will “eat up” some space;
  • suspended structures from moisture-resistant plasterboard and aluminum frame allow you to quickly level the surface of the base and veil its flaws. You can embed a spot light in them in the form of an original design, paint different tiers in several colors;
  • PVC panels are good because they do not require the construction of a supporting frame. This means the ceiling is plastic panels will not take up valuable centimeters of space in a small bathroom;
  • if you don’t want to lose extra centimeters, the ceiling can be decorated using a material such as tiles. The renovation of a bathroom in a Khrushchev-era house using this material can be seen in the photo.

Bathtub or corner shower stall

Many people do not understand why install a standard bathtub in a modest-sized room, because you can give preference to a compact shower stall. We describe the advantages and disadvantages of a corner shower stall in the table:





Furniture

In a Khrushchev-era building, the bathroom interior is of a modest size, and many pieces of furniture cannot be placed here. Furniture for a space of 5-7 sq. m should be small-sized, functional, beautiful, because a washing machine should also fit here.

corner shelf for placing jars of creams and shampoo bottles.

Try to use every meter of free space. For example, cover the space under the bowl with a special screen, then you will get additional space for storing household chemicals. If there is a window on one of the walls, seal it, this will allow you to use the wall surface more efficiently.

Visual increase in space To achieve visual increase

  • bathroom space you can apply the following tricks:
  • use a lot of white in the decoration of walls, ceilings, furniture, and plumbing fixtures; hang large mirror
  • with backlight. It reflects light well, creating the effect of expanding space; prefer glossy surfaces
  • and furniture facades;
  • If there is a window in the room, it should be sealed. The window between the bathroom and the kitchen can become an obstacle to the easy installation of wall slabs, cabinets and shelves; Avoid large scale tiles. As practice shows, large tiles visually conceal small space
  • , and small tiles, on the contrary, create the effect of visually distancing the wall. Only if the owner of the apartment can boast of a huge remodeled bathroom, then larger ceramics can be used; multi-level plasterboard ceiling

Repairs are different from repairs, and repairs in a Khrushchev building should not be budgetary anyway. And the result should be pleasant to the eye and to the touch. I came across just such a repair option on a well-known website. Well, as you already understand, I could not bypass this post and not duplicate it on this site with my comments. Looking ahead, I will say that this repair is not an indicator, but it can definitely be taken as a basis; it has its pros and cons, but more on them below.

A little background on the renovation: the bathroom was chosen as the first room for renovation, because no matter what you say, throughout the entire renovation the bathroom will be needed and you can’t go anywhere without it... And another reason was the announcement of the sale of a large and new one corner bath 150*150 for only 4000 rub. It was decided to purchase this miracle and expand the bathroom to fit the size of the bathtub. Perhaps this is not the best The best decision, because the size of the bathroom is not large and you could get by with a small bathtub or even a shower stall, but Khrushchev is already small, and with such a bathroom you can spend another hour like a master...

Another important point is that this repair was not done by a professional and for the first time, so we can conditionally say that such a repair is available to each of you, my dear reader!

Also pay attention to the pipes. Before starting repairs, it is imperative to replace it with plastic, or better yet, with metal-plastic, if this has not already been done. Pipes are the backbone of the bathroom and they must be made and done well.

Not a lot, not a little, was spent on the entire renovation - 60 thousand rubles.

So let's go!

This is what the bathroom looked like before the renovation

The plan of what was taken as a basis is the main diagram of the entire repair

Now let's move on to the process itself, step by step and with pictures. Let's start with the basics, i.e. floor - replacement of screed. This is what she was like:

Of course, such a floor is no good and we need a good foundation - fill it with:

The base of the floor is ready, let's move on to the base of the walls. Making a frame for the shelves:

The quality of my work is checked with an open eye, or rather four, but how can we do without it?

Everything has been checked and you can move on to another wall - glue the tiles.

After the bathtub is installed on the frame. We continue to work with the floor and install a heat cable - we make a warm floor.

Filling the cable

All the basics are ready, now let's move on to the design. And we start as usual from the floor. It was decided to make pebbles for the floor.

After the work, the inspection came again and approved the work with its seal. By the way, we bought stones for the floor in Yekateinburg, by weight. It took 50 kg. I glued it with Bergauf Ceramik Pro glue.

I install it directly above the washing machine. Saving space is everything, especially with a bathroom like this! All plumbing, including pipes and cords from the washing machine, are hidden in the frame.

Let's finish off the rest of the little things called baseboards for the bathroom:

Everything below the ceiling is almost ready, so we need to make the ceiling. The ceiling will be made of ordinary plastic panels:

We leave access to the power supply for the main and electrodiode lights in the ceiling; to do this, leave a hole and cover it with plastic:

We also install curtain rods. Since the bathroom is semicircular, a flexible cornice is needed, which was purchased and installed:

Now we are finishing the shelves, which in fact caused much more problems than expected:

And the last, if I may say so, touch is a cabinet, where it is used as a panel furniture board, treated with 6 layers of stain and 4 layers of varnish:

And this is the result of the entire repair - everyone was happy and yes - not a single cat was harmed :)

Some notes on actual use:

  1. In the first days, I didn’t really like the floor, it was ugly, although warm. I also thought about how it would be cleaned. In fact, I can say this: we were happy with this floor. The cable is always on and the stones are always warm. Weekly cleaning with a vacuum cleaner and a couple of times a month with a rag does not cause any problems. No floor mats are needed. No fungi or mold were found after a year - don’t forget about ventilation, it pulls everything out.
  2. The water supply, sewerage outlet and socket are located behind the washing machine.
  3. Wall-hung toilet, .
  4. Prices: bath - 4000 rubles, installation - 5000 rubles, toilet - 1250 rubles, sink - 2000 rubles, tiles - 18000 rubles, ceiling tiles - 200 rubles. I don't remember the rest...
  5. Footage of the room: it was 1.6 x 1.6, it was 2.3 x 1.6.

Constructive criticism:

  1. The bathroom takes up a lot of space. A regular-shaped bathtub might have been better suited, or even a shower stall.
  2. Installation for shelves removes 20 cm from the wall - not very effective.
  3. The floor turned out to be an acquired taste, perhaps it needs to be filled with self-leveling flooring - it should turn out beautifully.
  4. There is no heated towel rail - an unpleasant detail.
  5. The faucet is milked over the head of one of the places in the bathroom - this is not very convenient, although this has its advantages - when you bathe, the tap is at hand and you can even water from it... The bathroom place is not eaten up, the faucet can be easily bent.

For dessert: how to train a cat to go to the toilet?

Remove the cat litter box and insert a liner into the toilet instead. The hole in the liner must be gradually enlarged until the liner is no longer needed:

It’s not news to anyone that most of the population of our country lives in houses built by Khrushchev. For many Soviet families, the Khrushchevka is a long-awaited home of their own. Typically, apartments in Khrushchev buildings were distributed on a first-come, first-served basis. A lot has changed since then. Usually we get such apartments from our grandparents or buy them with a mortgage as the most affordable housing. And below you will learn how you can renovate a bathroom in a Khrushchev-era building, because this issue is relevant for many.

Features of the bathroom in the "Khrushchev"

Layout standard apartment in Khrushchev is known to everyone. Most often this is one or two rooms, a three-meter long combined bathroom and a six-meter long kitchen.

Often new owners receive an apartment in a deplorable condition. However, if you spend a certain amount of money, time and effort, then even a simple “Khrushchev” can be turned into quite presentable housing.

By approaching the task responsibly, even homeowners in new buildings can envy your stylish, new and comfortable interior.

The renovation of an apartment in a Khrushchev-era building should begin with the bathroom.

Bathroom renovation in Khrushchev: main problems

Initially, the Khrushchevs positioned themselves as a budget option housing, so they were completely freed from all excesses - both in practical and aesthetic terms.

Minimum planning usable space- as much as necessary to satisfy primary needs. And the bathroom is no exception. In a typical mixed bathroom there is barely space for plumbing equipment - toilet, sink, bathtub. But the owners still need somewhere to place a washing machine, mirror, shelf, cosmetics, towels and household chemicals. Therefore, issues of convenience and beauty often fade into the background, giving way to issues of saving space.

The first problem of renovating a bathroom in a Khrushchev apartment is the small area. The second is that “Khrushchevka” houses are very old. The first “Khrushchev” buildings were built in 1959, and the last in 1985. That is, today, the “youngest Khrushchev” buildings are about 30 years old. Many houses have not been exposed major renovation decades, so the condition engineering systems– ventilation, water supply, sewerage – leaves much to be desired. Since modern plumbing fixtures often require connection to reliable, new sewer and water pipes, it is better to replace the entire wiring. It will be impossible to replace, you will have to resort to major repairs.

Moreover, bad condition communications, the impossibility of transfer or replacement limits the freedom to remodel the bathroom.

Another problem concerns not only “Khrushchev” buildings, but also any housing built on a quick fix. It's about oh no smooth walls oh, which involve additional time and money so that they can later be tiled.

DIY bathroom renovation in Khrushchev: main stages

  1. Dismantling works.

It is better to plan the location of furniture and plumbing in the bathroom after completing the dismantling of all old decoration and equipment. Having before my eyes " Blank sheet"You will be able to fantasize much easier. Preparatory work it is necessary to start with dismantling the plumbing equipment.

As soon as all old technology cleaned up, let's start dismantling water pipes(if necessary). Then you should get rid of the old ones finishing coatings. Paint is removed from the floor and walls using a stiff metal brush, and the tiles are knocked down with a hammer, hammer drill and chisel. If it is necessary to level the floors, then the screed is crushed with a hammer drill until concrete base. Remaining dust and debris must be thoroughly removed.

  1. Replacement of pipes.

It is necessary to begin replacing sewer and water pipes even before the walls and floor are leveled. First, you need to have a detailed plan for the placement of plumbing, in accordance with which the pipes in the bathroom will be laid out.

If necessary, replace old cast iron pipes with plastic ones. They are not as reliable as cast iron, but they weigh much less, so installation can be done alone. Moreover, tees and plastic pipes can free up several centimeters of space.

The pipes are attached to the wall with metal clamps or placed in curtains on the wall. If necessary, you can hide them in a plasterboard niche, but it eats up quite a lot of space. Because the free place in a “Khrushchev” building is almost worth its weight in gold, it is better to spend time plastering the walls and gating.

When laying out sewer pipes, do not forget about the slope, which should be 10-20 mm per linear meter. Thus, you will increase the thickness of the screed on the floor, but it is important to respect the slope of the sewer pipes. In places where the pipe distribution connects to the riser, do not forget to provide the possibility of installing a walk-through tap so that you can turn off the supply of cold and hot water.

Electrical wiring is carried out before finishing work, since laying wires will additionally require trenching the walls.

Think about providing the bathroom with the required number of sockets (it’s good if they are double) with a high protection class. If there will be a lot of people in the bathroom electrical appliances, it is recommended to install a special residual current device on the wiring.

  1. Selection of building materials.

If you do not plan to spend a lot of money on renovating a bathroom in a Khrushchev-era building, then best option– painting walls using waterproof paint.

In addition to being cheap, this option has one more advantage: by purchasing a color or white paint, You will achieve the color that you need, while other finishing options do not always provide this opportunity.

However there is one here important nuance: In order for walls painted with waterproof paint to look beautiful, they need to be even, and this is not easy to achieve.

Another budget option is decorating walls with plastic panels. They differ great variety textures and colors, are easy to install and remove, do not require perfectly smooth walls and are easy to maintain.

Their significant drawback is that the finishing will sooner or later require replacement with a more durable building material.

The most common wall decoration is porcelain stoneware and tiles. Such materials have gained high popularity due to their resistance to temperature changes, service life and waterproofing properties. Now in the store you can find the tiles yourself different shapes– rectangular, square, hexagonal. There is no point in talking about the variety of patterns and colors for a long time - there are plenty of variations. If you cannot find among ready-made options suitable, that is, the ability to create your own patterns by combining tiles of different textures and colors.

Attention! Think it over color scheme in advance, because the overall perception of the room depends on it.

The most the best coverage Bathroom walls and floors will have tiles as they can provide the required level of waterproofing. There are other floor covering solutions. The most budget-friendly of them is linoleum, and the most expensive is waterproof laminate. But in terms of their characteristics, they are inferior to tiled floors.

The ceiling can be covered with plastic panels or painted with white paint. But we advise you to spend more and install suspended ceiling. First of all, it looks good and also protects you from leaks. And if you decide to opt for a glossy material, then the ceiling will visually appear higher than it actually is.

Attention! The design of the bathroom ceiling should be harmoniously combined with the interior of the room. The ceiling in the bathroom can be very different, embody your design ideas and carefully read our material. At the same time, do not forget that finishing the ceiling should be started only after finishing the walls.

  1. Preparing surfaces for finishing.

Preparing walls and floors for installation begins with dismantling the old coverings, which we have already discussed above. Once the old coating is removed, you can begin leveling the surfaces. Cement-based plaster is used for the walls. When it dries, it is necessary to treat the seams with putty. The walls can be leveled using drywall, but this method will reduce the space of the bathroom.

As for leveling the floor, the procedure is carried out as follows: after dismantling concrete screed remove remaining dust and debris, lay waterproofing, making a 15 cm overlap on the walls, and then fill in a new screed.
  1. Wall decoration with tiles.

Follow this procedure:

  • by using building level and plumb line, mark the wall with vertical and horizontal lines.
  • Prepare the glue for impregnation, and then apply it with a spatula to the places where the work will be carried out.
  • Next, use a serrated spatula to go over the entire section of the wall. The glue will form grooves.
  • Once the job is complete and the tile adhesive has dried, seal the seams with tile grout.
  1. Purchase and installation of plumbing fixtures.

Homeowners in Khrushchev-era buildings have to be especially careful when choosing plumbing fixtures. First of all, you need to make a choice between a shower cabin and a bathtub, since in a small room you can find space for one of these devices. The shower allows you to significantly save room space, which you can use to install a washing machine. Moreover, people with disabilities and the elderly will find it much easier to use a shower than a bathtub without assistance.

In addition, the bathroom is convenient for washing large items that require delicate washing, as well as for bathing small children. Plus, many people sometimes love to soak in fragrant foam or warm water.

Perfect for a bathroom in a Khrushchev-era building corner models baths, toilets and sinks. The sink can be installed directly above the washing machine by purchasing a lily pad model, or the cabinets can be mounted into the countertop. There are also sinks that can be placed directly above the bathtub, but this design will not be entirely convenient.

When choosing a toilet, you need to pay attention to the drain. This system can be vertical, horizontal or oblique. The first flush systems provide the opportunity to install the toilet against the wall, so we recommend choosing them.

  1. Selection and installation of doors.

When buying bathroom doors, you need to consider the following important points:

  • the door must be highly resistant to moisture, temperature changes and not deform over time;
  • it must have noise-insulating and heat-insulating properties;
  • high-quality locks and handles should be installed on the doors, since they wear out very quickly in the bathroom;
  • the door must have vent. If it is missing, during installation you need to make a gap between the floor and the door.

Typically, bathroom doors are made of plastic, tempered steel, chipboard or wood. If you choose products from the best manufacturers, no matter what material the door is made of, it will serve you for many years.

To save space, pay attention to pendulum swing or sliding doors. You can also give preference to folding doors made according to the “accordion” principle.

You can install the door to the bathroom only after all finishing work has been completed. If you bought an ordinary swing door, then make sure during installation that it opens outward and not inward.

A good bathroom renovation is the calling card of the entire apartment and the attitude of the owners towards the family and themselves. You can make a stylish renovation in the living room, but if the bathroom is unpresentable, people will get the wrong impression - the desire to appear prevails over the essence. Therefore, do beautiful renovation bathroom in Khrushchev is the first task.

The housing built during the reign of Khrushchev perfectly solved the problem - resettling the barracks and improving the quality of life of the population, as a result, increasing the birth rate and strengthening the institution of the family. It was planned to further improve living conditions, but it didn’t work out, and now the owners of the “khrushchubs” are trying to make them morally obsolete square meters stylish content and modernization. In Europe, in principle, they take care of any housing and extract maximum benefit from the most neglected cases without compromising quality.

In bathroom standard Khrushchev The weak link is the size. Therefore, it is necessary to measure the area of ​​the bathroom taking into account every centimeter.

Compact bathroom with dolphins

Dismantling plan

The main rule is to start and stop repairs within the given time frame!

In the implementation of the task, the following are important: dismantling plan, design project, finishing, deadline for each stage of repair and finishing.

Dismantling plan:

  • If the bathroom is separate, think about whether it’s worth combining it. On the one hand it will be added effective area, on the other hand, only one person can use a shared bathroom; if someone needs to satisfy their “natural urges,” they will have to wait or run to their neighbors.
  • Having decided to combine the bathroom and toilet room , make sure that from a legal point of view, there will be no problems. Renovating a bathroom in Khrushevka requires not only material, but also legal preparation when combining a bathroom at your own discretion.
  • Conduct a plumbing inspection: what to keep, what to throw away, what to restore.
  • To be or not to replace pipes- inspect the water supply and sewer systems, old ones cast iron pipes definitely needs to be replaced. Their service life has long expired and if a pipe burst occurs after the repair is completed, then all your efforts will be in vain.
  • Take it out of the bathroom mirrors, shelves, furniture, leave the bathtub and toilet. It is not yet known how long the repairs will take, but hygiene procedures are mandatory; disconnecting and dismantling plumbing fixtures is done last.
  • Inspect the doors; quality gives solidity and completeness to the interior of the entire apartment. identical doors, baseboards and perfectly finished ceilings. Renovating a bathroom in a Khrushchev building can become the starting point for renovating the entire apartment. If you are on the way to your goal, then the doors are worth changing.
  • Decide what the floor will be. The bathroom is rarely heated, which means it is quite cool in winter. A heated floor will help in heating the bathroom - you can do it yourself comfortably and inexpensively.
  • The work front is indicated.

Design project

Exist ready-made design projects, with a slight adjustment to the size of a particular bathroom, they are quite acceptable. Another option is to implement the bathroom design in the context general style Houses. That is color palette resonates with all rooms, the chosen style leaves its mark on the bathroom space. These are standard and good solutions for bathroom design. Many people have done bathroom renovations in Khrushchev, and worthy examples can be found in open sources.

If you take a non-standard approach, think of a separate design for the bathroom, which a specialist, preferably with a specialized architectural education, will help implement. He will not only design the design component, but also give professional tips and advice in repair and finishing work. Moreover, most of them know about the qualities of construction and finishing materials not only from the words of a consultant, but have also tested them in practice. Due to the nature of the profession, a practicing architect probably knows where to buy high-quality plumbing fixtures and furniture and will offer to do so at a discount.

Construction fever

Having understood what the bathroom will be like, purchase Construction Materials, finishing materials can be purchased during the construction process.

    • Pipe replacement. Bathroom renovation in Khrushchev begins with pipes. After dismantling the old water supply and drainage system, check the risers; they may also need replacement. Typically the communication system Khrushchev's apartments hidden in a box. Hiding communications is important, but more important is how to do it. The optimal solution is . Access can be obtained at any time. You can never be sure that all the neighbors on the upper floors not only changed communications, but also did it correctly. Therefore, leave full access to the pipes, and not in the form of a small window for one hand.
    • Walls. The wall cladding needs to be knocked down. But in the case of a bathroom in a Khrushchev building, it is necessary to knock it down before brickwork. This will provide an excellent base for thoroughly plastering the walls. Level walls using plasterboard sheets in a small bathroom means “stealing” a decent amount of space, on the scale of the bathroom.
    • Renovating a bathroom in a Khrushchev-era building cannot be done without an inspection of the electrical network. Before starting plastering work, check the electrical wiring and it is better to replace it. Place the bathroom wire in plastic pipe to protect from moisture. Route the wiring into the grooves and secure it to the wall with metal pipe clamps.

Multi-colored cladding
  • Floor. Remove the old base and clean the floor thoroughly. Before making a screed, check the level of the floor; if there is a slope, take this feature into account and strive to make the new floor as level as possible. For installation, carry out all the required work so that the last step is only the cladding.
  • Having completed water supply installation and sewers, check them in action, eliminate all shortcomings and minor leaks.
  • Ceiling. Better for this surface. Typically, the ceilings in Khrushchev-era buildings are low, and therefore any cladding will lower the ceiling. But there is a trick that will help you visually make it taller. Mount a special wide cornice around the perimeter of the bathroom to LED backlight. In this case, the benefits will be multiple: several lighting scenarios, the ability to set the color, the absence of a central lamp, regulation of light intensity, energy efficiency.

At all stages construction work there are intermediate stages of drying. This rule applies to screed and plaster; Gating and laying pipes also do not take place in one day. In the process of this work, you can purchase finishing materials, plumbing fixtures, furniture, decor and all the necessary little things for the bathroom.


Shower box in a small bathroom

The joys of finishing

  • Put door frame, if you decide to change the door.
  • The walls are finished first. It is easy to lay facing on plastered and leveled surfaces. It is not always necessary or advisable to tile a wall from floor to ceiling; a painted one looks very nice water-based paint a wall on which you can place a cute poster, photo or other things self made. Perfect for interior decoration - endless possibilities for decoration.
  • The next step is to tackle the ceiling; it is easier and more expedient to paint it in White color. Give him the opportunity to breathe and not “put pressure” on the surrounding space. Renovating a bathroom in a Khrushchev-era building makes it possible to make the interior more free.
  • The last stage of finishing work is floor covering. The best option- ceramic tile. There are a great many options for colors, shapes, and sizes, but one condition is important - the roughness of the tile surface. The humid environment of the bathroom makes glossy tiles dangerous, so choose floor tiles with a non-slip surface or provide a special rubber mat for the floor.
  • Do the cleaning.

Designer shower

Bathroom renovation in Khrushchev: stages of work

Active finish

When all the finishing work has been done Finishing work All that remains is to bring in and install the heating equipment in its place,